SRS = Shackle Reversal System or Setup
There's more discussion out there to be read about SRS than you could possibly ever take in. Some people like it, some don't, both sides definitely have pros and cons. I won't go into all the reasoning here again, as I said, you can already read about it until your eyes fall out....
After reading a lot and calling a couple of "local" shops, I decided I didn't want it and set out to do my own. I have drawings for the pieces I had made and the cardboard templates in the garage somewhere if someone really wants them.
Let me put this disclaimer on this post: I haven't trail-driven my scrambler yet with my new setup. I've put on a few hundred road miles, but it's not trail tested. I felt comfortable doing this with my background in structural/mechanical engineering and with the knowledge and help of a master welder Scrambler buddy
to make the brackets I designed. Follow my lead at your own risk! (duh) Oh, and mine is right-hand drive, so that explains the steering box location in my pics
EDIT 1/27/09: I've now trail ridden this a bunch with no problems.
What I did was design brackets in the rear that moved the rear spring mount and front shackle hangers outboard of the frame. I also decided to move the front axle back .5" because I knew I was going to have pitman-to-tie rod clearance issues to overcome when moving to a D44. Everything I did was in 1/4" plate.
The rear mounts are welded to the bottom of the frame all the way across the frame (he welded the frame seam first) and gusseted to the side of the frame in three places. The rear gusset ties into the body mount that's in this area as well. I kept the same vertical mounting position as stock, so there's no lift added from the brackets (something that a lot of the SRS versions didn't do, they had lift built in)
The front ouboarding is a little more complex because there's a lot going on, especially with the steering box mount.
What I realized is that the stock setup uses the shackle hanger as an integral piece, but this could be replaced with 1/4" plate easily and then you could mount the hanger on the plate and everything else would bolt right back in (obviously with all the needed holes located and drilled). I also like that there's a lot of stock threaded holes you can pick up with these new plates.
So I made plates that bolt in place of the stock shackle hanger, picked up a couple other holes on the passenger side and drilled new holes for the shackle hanger in the correct outboarded position.
I spaced my gussets so that the winch plate fits bewteen them and shaped the new plate around the gussets to flow somewhat with the lines on the frame. We bolted these into place (after tacking in the rear spring mounts), checked all of our measurements and squareness of the front end and tacked these to the frame.
After checking everything again three times, Joe burned in all of the pieces. The front is welded all around the perimeter of the plate except at the back edge across the frame.
With this setup, the suspension bolts right on and everything fits fine. I think, especially compared to the stock setup, that this is much stronger that it needs to be (Joe kept commenting on this from his view as a welder) and will hold up to anything I could put on it.
It kept the stock shackle-forward setup and was not really complicated other than TONS of measuring, drawing, remeasuring, making cardboard templates, checking, etc.
I gave measurements on cardboard templates to a metalworker to burn the pieces out and cleaned them up with a grinder. Joe was THE MAN on the welding and loved helping this come together and was great with what to check on the suspentsion measurements (he's a body and frame guy).
It's not a simple DIY and took me forever (but I was on borrowed welder time and life was going on at the same time). If you could get the pieces cut and are a competent welder, one day of welding will get this together. All the pieces are flat plate and won't take much to get cut. I figure I had ~$200 in the hard costs including new grade 8 hardware for the front mounts/hangers.
Here's the thread that shows some more of the fabrication/planning/fitup (along with a bunch of other stuff I did to mine to rebuild it after an accident
): linky
Hope this helps someone sometime...
There's more discussion out there to be read about SRS than you could possibly ever take in. Some people like it, some don't, both sides definitely have pros and cons. I won't go into all the reasoning here again, as I said, you can already read about it until your eyes fall out....
After reading a lot and calling a couple of "local" shops, I decided I didn't want it and set out to do my own. I have drawings for the pieces I had made and the cardboard templates in the garage somewhere if someone really wants them.
Let me put this disclaimer on this post: I haven't trail-driven my scrambler yet with my new setup. I've put on a few hundred road miles, but it's not trail tested. I felt comfortable doing this with my background in structural/mechanical engineering and with the knowledge and help of a master welder Scrambler buddy
to make the brackets I designed. Follow my lead at your own risk! (duh) Oh, and mine is right-hand drive, so that explains the steering box location in my pics
EDIT 1/27/09: I've now trail ridden this a bunch with no problems.What I did was design brackets in the rear that moved the rear spring mount and front shackle hangers outboard of the frame. I also decided to move the front axle back .5" because I knew I was going to have pitman-to-tie rod clearance issues to overcome when moving to a D44. Everything I did was in 1/4" plate.
The rear mounts are welded to the bottom of the frame all the way across the frame (he welded the frame seam first) and gusseted to the side of the frame in three places. The rear gusset ties into the body mount that's in this area as well. I kept the same vertical mounting position as stock, so there's no lift added from the brackets (something that a lot of the SRS versions didn't do, they had lift built in)
The front ouboarding is a little more complex because there's a lot going on, especially with the steering box mount.
What I realized is that the stock setup uses the shackle hanger as an integral piece, but this could be replaced with 1/4" plate easily and then you could mount the hanger on the plate and everything else would bolt right back in (obviously with all the needed holes located and drilled). I also like that there's a lot of stock threaded holes you can pick up with these new plates.
So I made plates that bolt in place of the stock shackle hanger, picked up a couple other holes on the passenger side and drilled new holes for the shackle hanger in the correct outboarded position.
I spaced my gussets so that the winch plate fits bewteen them and shaped the new plate around the gussets to flow somewhat with the lines on the frame. We bolted these into place (after tacking in the rear spring mounts), checked all of our measurements and squareness of the front end and tacked these to the frame.
After checking everything again three times, Joe burned in all of the pieces. The front is welded all around the perimeter of the plate except at the back edge across the frame.
With this setup, the suspension bolts right on and everything fits fine. I think, especially compared to the stock setup, that this is much stronger that it needs to be (Joe kept commenting on this from his view as a welder) and will hold up to anything I could put on it.
It kept the stock shackle-forward setup and was not really complicated other than TONS of measuring, drawing, remeasuring, making cardboard templates, checking, etc.
I gave measurements on cardboard templates to a metalworker to burn the pieces out and cleaned them up with a grinder. Joe was THE MAN on the welding and loved helping this come together and was great with what to check on the suspentsion measurements (he's a body and frame guy).
It's not a simple DIY and took me forever (but I was on borrowed welder time and life was going on at the same time). If you could get the pieces cut and are a competent welder, one day of welding will get this together. All the pieces are flat plate and won't take much to get cut. I figure I had ~$200 in the hard costs including new grade 8 hardware for the front mounts/hangers.
Here's the thread that shows some more of the fabrication/planning/fitup (along with a bunch of other stuff I did to mine to rebuild it after an accident