I did the body work on the sides of the tub. I removed the braces (under the front feet of the roll bar) to epoxy. I then put the tub on a rotisserie to do the bottom. I did the epoxy primer and bedliner. Put the tub back on the saw horses and finished the body including painting, thought nothing about it. Did this in winter (heated building) and left it sit till the next winter. When I went back to continue I found a crack (like the skim coat of body filler lost it's bond). I took it down till I thought I got it and re-did the body work and paint. It sat till this winter. I looked at it and the crack was back.
This pic was taken in november.
This pic was taken in november.




. To be sure I cut a piece of 18 gauge sheet metal and made a patch (using panel adhesive) to reinforce the metal.