Dmcgi97502
81 Scrambler rebuild
- City
- Naperville
- State
- IL
I've been working my way from the front of the frame to the rear to get it ready for paint but I've put off the holes in the back long enough! A previous owner took some angle iron and welded it over the rust holes and then welded the spring hangers to the angle iron. It works ok but I am looking for a better way to do it. My thoughts are to cut out the rust and weld in new steel and support with the rear frame plates I bought from Chiefawho (which are really nice). My other thought is to chop the last couple feet off the frame (right behind the wheel bend) and fab a new section then butt weld it in place and brace with frame supports. Has anyone tried this? Will it be strong enough? I'll attach a couple pics for your enjoyment!

Anyway I too was hoping to maybe use part of a CJ-7 frame to make repairs with. My understanding with the frame plates is they don't go all the way to the rear of the frame but come up 6" short. Is that true? Most of my damage is in the section right where the shackle hander is - the last 23" of frame. Any advise?