• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

My De-Rustification Project

Thanks Jim. Gonna lay out in the cold and get the drive shafts removed this weekend. Hopefully. Also hope to get the e-brake cables tomorrow.

Does anyone know which cable goes into which hole on the equalizer? I forgot to take a pic. Does it matter? I know the driver side wheel cable goes into the lower hole on the frame bracket.

This is mine. Laying down and looking up at it. The bottom hole goes to the driver side. Is that what you wanted?

equalizer.JPG
 
So I got new bolts and nuts. Had to go to HD and Lowe's to get the right combo of grade 8 needed for the sway bar. I got all of them except for the nuts needed for the spring plates. I can reuse one of them. I will see if I can get the other one off of the bolt I had to cut off of the old spring plate. But that will be tomorrow. Soaking tonight.
 
If you reuse the nuts make sure you lock tight them. Don't want them loosening up.
 
If you reuse the nuts make sure you lock tight them. Don't want them loosening up.

Thanks. Good idea.

Today I took the driveshafts off of the old girl. Man, that was too easy. Two caps came off of the front most u joint. Looks like I will be getting some new ones. Just because.

And here is an unexciting pic. Because we all love pics.

d58a4272e524536ddfe26919cc20592c-1.jpg
 
Man. I am really going to need to repaint the garage floor when this project is done. I hame made a real mess.
 
[emoji106][emoji106][emoji106] you're moving now. Let me know if you need another set of hands next week. I can introduce you to my little friend ImageUploadedByTapatalk1451865893.565120.jpg
 
So I was up last night from 2am to 4am thinking about all of the things left to do. Kid of depressing. I need to start taking the grill and fenders off. Labeling all of the wires so I can make sure everything goes back together correctly. Still waiting on the ebrake cables. The body mounting kit should arrive today. Two pieces need welding so that is another thing I need to get someone to help with (no welder and no welding skill).

The big thing I was thinking about was when I move the engine and transmission, I want to replace the rear main seal and install a new clutch. So that means there will be more time before I can bring the body over since I assume it will be easier to do with the tub off.

These fun thoughts are plaguing me.
 
So I was up last night from 2am to 4am thinking about all of the things left to do.
'

Ha, I was driving a couple days ago and the wife says "What are you thinking about?"

I'm sure she was wanting a "I'm thinking about what an awesome wife you are" but instead she got "I'm wondering what degree shims I need to order for the rear axle on the tan Jeep. It has a shimmy at highway speeds"

She pouted for awhile on that one.
 
So I was up last night from 2am to 4am thinking about all of the things left to do. Kid of depressing. I need to start taking the grill and fenders off. Labeling all of the wires so I can make sure everything goes back together correctly. Still waiting on the ebrake cables. The body mounting kit should arrive today. Two pieces need welding so that is another thing I need to get someone to help with (no welder and no welding skill).

The big thing I was thinking about was when I move the engine and transmission, I want to replace the rear main seal and install a new clutch. So that means there will be more time before I can bring the body over since I assume it will be easier to do with the tub off.

These fun thoughts are plaguing me.

Funny, I was up with both kids around 2 am... then the cat started puking... and the whole time I was thinking, did I tighten all the bolts on the suspension lift?

cb
 
So I was up last night from 2am to 4am thinking about all of the things left to do. Kid of depressing. I need to start taking the grill and fenders off. Labeling all of the wires so I can make sure everything goes back together correctly. Still waiting on the ebrake cables. The body mounting kit should arrive today. Two pieces need welding so that is another thing I need to get someone to help with (no welder and no welding skill).

The big thing I was thinking about was when I move the engine and transmission, I want to replace the rear main seal and install a new clutch. So that means there will be more time before I can bring the body over since I assume it will be easier to do with the tub off.

These fun thoughts are plaguing me.

Dain, the problem is you're thinking to much. lol. You need to approach this project just like you would eat a cake, take one piece at a time, then eat each piece one bite at a time. Before long the whole cake is done. Don't let it overwhelm you.
 
Dain, the problem is you're thinking to much. lol. You need to approach this project just like you would eat a cake, take one piece at a time, then eat each piece one bite at a time. Before long the whole cake is done. Don't let it overwhelm you.

Thanks. I will try that. It was overwhelming me last night. I was much better each day the past week while I was making slow and steady progress. I just wish I didn't have a day job I need to be at.
 
So, despite talking to UPS on Saturday to have them deliver the box to my house, I got notice today that the package was ready for me to pick up at their "service" center. SO I ran at lunch to pick it up. I now have my ebrake cables. SO I should be able to install them and put my rear brakes together soon. Woot.

Also, after all of that thinking last night, I am going to plan to yank the engine and transmission out the weekend of 1/23-1/24. Hopefully by then I will have removed the grill and fenders (and labeled everything correctly). I need to coordinate borrowing a hoist for that weekend as well.

So ....., for any of the northern VA (or MD) folks that would like to come by and help me move those things, I would be appreciative. I will plan on moving the tub another time as I will plan on replacing the clutch and rear main seal before the tub goes on (as mentioned above).

Let me know if anyone wants to help that weekend. I will post up if that date changes. Hopefully it won't. Too bad it is finally getting cold around here. Grrr.
 
Here is a pic of the ebrake cables. Woot. Finally.

02ec416b41de2929ff17dbe5f5913f06-1.jpg


Along with my reward for not choking the customer "service" reps.

Oh, the body mounting kit arrived today as well. But that will sit until closer to the time I need it.
 
I'm wide open that weekend and most of the others. Just let me know anytime you need me.


 
So I was up last night from 2am to 4am thinking about all of the things left to do. Kid of depressing. I need to start taking the grill and fenders off. Labeling all of the wires so I can make sure everything goes back together correctly. Still waiting on the ebrake cables. The body mounting kit should arrive today. Two pieces need welding so that is another thing I need to get someone to help with (no welder and no welding skill).

The big thing I was thinking about was when I move the engine and transmission, I want to replace the rear main seal and install a new clutch. So that means there will be more time before I can bring the body over since I assume it will be easier to do with the tub off.

These fun thoughts are plaguing me.

I definitely get to this point sometimes, too. I want this thing to be done so bad that I just feel overwhelmed thinking about it. I just try to take a step back and tell myself that it's a process and that it's going to be awesome when it's done.

Keep up the good work!
 
Back
Top