My wife and I want to convert the brick paver patio underneath our deck to a 3 season room.
That means the 4th season (winter), the jeep could be stored there.
Ideally, i'd pour a concrete slab down there and finish it with some wooden subfloor and tile.
BUT, pouring a concrete slab there is not feasible (too long to explain).
So, I'm thinking of building a deck to support the weight of the CJ-8 during the winter.
Here are some ideas... give me your opinions. Do you have other ideas?
OPTION A
Build a deck floor of pressure treated 2x4's with pressure treated deck boards that sits on top of (ie comes in contact with) the brick paver patio.
DOWNSIDE: since it wouldn't be connected to the walls, I could have problems at the door way.
UPSIDE: Cheapest and easiest route.
Questions for Option A:
A1) are single 2x4 joists sufficient (remember, the entire deck floor will be laying entirely on the brick pavers)?
A2) Do I need to worry about laying pressure-treated joists on brick pavers were there will probably be some moisture from time to time?
A3) I could excavate the pavers and add 3/4" stone for drainage, but then the 2x4s joists would be sitting on 3/4" stone -- would that be sufficient to NOT shift over time under the weight of a CJ-8?
OPTION B:
Pour piers (footings) and build a true deck with 2x8 pressure treated joists under a deck.
DOWNSIDE: I don't have much vertical room. I have about 5.5" now between the brick pavers and the walk-out basement sliding door. If I remove the pavers, I get 2.5" more and if I remove the sand, I get may get another 4" for a total of 12". Problem is, 12" means the top of the piers would have to be below grade of the outside grass/soil (not good to run risk of having wood in contact with soil sometime in the future).
Questions for Option B:
B1) Will single 2x8 joists 16" on center support the CJ-8's weight or should I double up the 2x8 joists by "sistering" them together?
ANY OTHER OPTIONS?
Thanks,
Jim
That means the 4th season (winter), the jeep could be stored there.
Ideally, i'd pour a concrete slab down there and finish it with some wooden subfloor and tile.
BUT, pouring a concrete slab there is not feasible (too long to explain).
So, I'm thinking of building a deck to support the weight of the CJ-8 during the winter.
Here are some ideas... give me your opinions. Do you have other ideas?
OPTION A
Build a deck floor of pressure treated 2x4's with pressure treated deck boards that sits on top of (ie comes in contact with) the brick paver patio.
DOWNSIDE: since it wouldn't be connected to the walls, I could have problems at the door way.
UPSIDE: Cheapest and easiest route.
Questions for Option A:
A1) are single 2x4 joists sufficient (remember, the entire deck floor will be laying entirely on the brick pavers)?
A2) Do I need to worry about laying pressure-treated joists on brick pavers were there will probably be some moisture from time to time?
A3) I could excavate the pavers and add 3/4" stone for drainage, but then the 2x4s joists would be sitting on 3/4" stone -- would that be sufficient to NOT shift over time under the weight of a CJ-8?
OPTION B:
Pour piers (footings) and build a true deck with 2x8 pressure treated joists under a deck.
DOWNSIDE: I don't have much vertical room. I have about 5.5" now between the brick pavers and the walk-out basement sliding door. If I remove the pavers, I get 2.5" more and if I remove the sand, I get may get another 4" for a total of 12". Problem is, 12" means the top of the piers would have to be below grade of the outside grass/soil (not good to run risk of having wood in contact with soil sometime in the future).
Questions for Option B:
B1) Will single 2x8 joists 16" on center support the CJ-8's weight or should I double up the 2x8 joists by "sistering" them together?
ANY OTHER OPTIONS?
Thanks,
Jim