• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

Need opinions on CJ-8's seasonal storage deck floor

CJ-8_Jim

Scrambler Junkie
Lifetime Member
City
NW Chicago Suburb
State
IL
My wife and I want to convert the brick paver patio underneath our deck to a 3 season room.

That means the 4th season (winter), the jeep could be stored there.

Ideally, i'd pour a concrete slab down there and finish it with some wooden subfloor and tile.
BUT, pouring a concrete slab there is not feasible (too long to explain).

So, I'm thinking of building a deck to support the weight of the CJ-8 during the winter.

Here are some ideas... give me your opinions. Do you have other ideas?

OPTION A
Build a deck floor of pressure treated 2x4's with pressure treated deck boards that sits on top of (ie comes in contact with) the brick paver patio.
DOWNSIDE: since it wouldn't be connected to the walls, I could have problems at the door way.
UPSIDE: Cheapest and easiest route.

Questions for Option A:
A1) are single 2x4 joists sufficient (remember, the entire deck floor will be laying entirely on the brick pavers)?
A2) Do I need to worry about laying pressure-treated joists on brick pavers were there will probably be some moisture from time to time?
A3) I could excavate the pavers and add 3/4" stone for drainage, but then the 2x4s joists would be sitting on 3/4" stone -- would that be sufficient to NOT shift over time under the weight of a CJ-8?


OPTION B:
Pour piers (footings) and build a true deck with 2x8 pressure treated joists under a deck.
DOWNSIDE: I don't have much vertical room. I have about 5.5" now between the brick pavers and the walk-out basement sliding door. If I remove the pavers, I get 2.5" more and if I remove the sand, I get may get another 4" for a total of 12". Problem is, 12" means the top of the piers would have to be below grade of the outside grass/soil (not good to run risk of having wood in contact with soil sometime in the future).

Questions for Option B:
B1) Will single 2x8 joists 16" on center support the CJ-8's weight or should I double up the 2x8 joists by "sistering" them together?


ANY OTHER OPTIONS?

Thanks,
Jim
 
Last edited:
Any particular reason to move away from the pavers? You could get an outdoor rug to cover the pavers if you're wanting a "softer feel" to the room.
Otherwise I think I like option A. Biggest issue might be that any moisture down there likely wouldn't dry out easily and I assume would mildew with time.
 
Pavers and a rubber matting to keep it warm OR concrete slabs (1mx1mx3cm) and pave it with them, Less likely for the jack to get stuck on a lip, but you need to make sure the sand is dead level or the slabs will break.

I go for pavers and a thick plywood sheeting.
 
How are you sealing the moisture entry through the upper deck, or is it an enclosed porch above?

In regards to your question for Option B, the use of 2x8 material would be dependent on the length that you're spanning the material. Generally, 2x8 Hem-fir will provide a 10psf dead-load weight in about 12' to 14' spans with a No.2 or better grade, at 16"oc.

How many square feet of floor space does a Scrambler occupy? I don't really know how to determine this mathematically, since the square footage would technically be based upon the amount of tire tread-to-surface contact only (point load), so that would mean something like 4sf. I don't know what the weight of a Scrambler is either, but let's say it is 4000lbs. Now, the front is heavier than the back, so we should concentrate on the front weight, and assume that it is 2500lbs. Using simple numbers and simple division, the floor should be built to withstand a 1250psf dead-load. However, this would be a "real-life" scenario, by using a "point-load" calculation and may be quite a bit of overkill.

A building department code requirement would probably take the overall footprint of the Jeep, and divide that number by the weight of the Jeep. Using this format, it would calculate to about 85psf of dead load requirement, and seems more logical.

With limited floor height restrictions, I'd entertain the idea of narrowing the floor joist spacing, decreasing the spans and using 4x8 dimensional material. This is starting to sound expensive. However, I'd plan the approximate floor space to be occupied by the Jeep, and simply overbuild that area with the three items suggested above. If we were using the point-load calcs, that space would essentially become almost a solid mass of wood, to fit within your limitations.

Your best option for limited expense is Option A, when considering the weight the floor is required to support. If you go with Option B however, you are able to use alternative materials, as you're then limiting moisture exposure to the wood. For example, a 3x9 glulam will support almost 900lbs/lf in an 8' span.

I can't think of any other suggestions, other than the selected decking material can also assist your weight requirements. As an example, 2x8 decking will better disperse the dead-load versus that of plywood; think of weight transferred between joists.

Posting a picture of your layout might help with ideas.
 