Jeremy
Scrambler Fanatic
- City
- Carlisle
- State
- PA
Our current status reports is as follows:
Dad's 1974 CJ6 striped to the frame in prep for a POR 15 and holes are being made in the aluminum CJ8 body to put in the brake resevoir, pedals, and wiring
1981 CJ8 inspection ran out a year ago, I have a BORLA header to install, ordered (backordered) a Catalitic converter, and a Mopar MPI kit. S
in prep for inspection and immissions testing (The immisions law just passed)
1982 CJ8 I have ordered a catalitic converter, New brake line (my rear ones broke today) and a headlight bulbs. inspection runs out in october. busy busy here.
Dad's 1974 CJ6 striped to the frame in prep for a POR 15 and holes are being made in the aluminum CJ8 body to put in the brake resevoir, pedals, and wiring
1981 CJ8 inspection ran out a year ago, I have a BORLA header to install, ordered (backordered) a Catalitic converter, and a Mopar MPI kit. S
in prep for inspection and immissions testing (The immisions law just passed)
1982 CJ8 I have ordered a catalitic converter, New brake line (my rear ones broke today) and a headlight bulbs. inspection runs out in october. busy busy here.
