• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

Floorpans

sarge_and_corey

Basic User
Hey Guys,

great site you have got here, love to see all the CJ-8 owners together in one place.

I recently bought a CJ-8, and am building it up to take some serious abuse. I've done detroits front and rear, 4.56 gears, 1 piece rear axles, 1330 driveshafts front and rear, Pro-Comp 4" lift, and new body bushings. It sits on 35 x 12.50 Cooper STT's. This is my 5th Jeep I'm building up. This one already is my favorite by far.

I also have welded on 14 gauge body armour all around the entire tub, tied the cage into the frame, build high clearance low-pro bumpers, and have installed TJ flares.

I'm wondering if anyone knows where I can order a "whole floor" for this Jeep: i.e - I don't just want the two foot well skins but the a one piece floor pan with the tunnel in it. Your thoughts?

*Here is my Jeep 2 months ago before I began the body armour.
 
I phoned "Modern Motors" in Alberta where I live, they are a Jeep specialty store.

They have the full pan like you linked to, and it is supplied through Omix-Ada in the States.

However, there is a problem...their best price is 510.00 Canadian (350.00 U.S),
but the Omix-Ada website lists it as 199.00 US.

So I might have to contact these guys directly.
The biggest problem is duty on cross-border shipping.
 
Hi Corey, welcome aboard, you'll find friendly and fun people here.

Nice Jeep too!
 
Hey Corey,

Nice to see another Canuk CJ8 Nut! I'm in Calgary and have two project Scramblers! One is in a rusted heep while the other is sandblasted and being reskinned and built-up (floor included).

I've ordered all parts from Morris 4x4 Center in Florida. I know it seems far but heres the thing, they really are cheaper! I hate to take my business out of town but at the cost savings I'd be crazy not to. These guys will match any competitors price and give you an honest evaluation of shipping via Fedex ground (disregard the quote in the web page, they never charge that much!).

I paid....$48usd to ship two front half side panels (4x3' box) and another $35cdn for duty and GST. Thats about $100 cdn to my door. I figure you could get the floor to GP for under $400cdn in under 10 days. Worth it? I say YEP!

Good luck. Drop me a line if you're in Cow Town!

Gord
 
Yes! It's a total replacement With all braceing and mounts with the exception of the front toe board supports!
Yours might be reuseable or fixable! If not you can get a pair from Classic @ the link Muels posted above! As far as the bed goes i used 1/4 " diamond plate and it really turned out great! After your done all the replacing just remember that bed liner and under coating are a must! I guess that goes without saying!We just got done our latest frame up and Herculied the interior of the cab,bed and undercoated the entire bottom of the tub! Let me know if you need any more pics or info! I'd be glad to help! Kurt
 
Last edited:
Thanks, that helps a lot! I've been holding off buying this floor section until I knew about the supports.

I agree that a spray liner is a must. I've also been applying POR-15 between all the seams and joints of the new panels. I am also going to POR the entire interior and underside before the spray liner....should never rust after that, otherwise, it’s straight to an alum tub!

L8r,
G
 
I installed the full legnth pans from Classic enterprises as well as their cross braces. These are high quality very well bilt parts. It's a big install, but well worth the final result. There is nothing else on the market like thses.
 
But why piece the floor together with Classic Ent. stuff when a full floor pan is cheaper, even after buying the toe supports? Is the gauge or quality of the Omix-Ada product questionable? Does it really matter if it isn't to the exact quality as it'll be spray-lined anyways?

Input needed.....Just trying to get the best replacements for the old girl!
 
Same gauge as stock! Classic may be a heavyer gauge but IMHO if you pour 15 and line it that is plenty! Classic makes some great stuff but full replacement floor from Omix is more then adiquite and is easier then patching! Plus the cross members are already welded on!
 
Last edited:
Rubberhook

To get this straight you used a full floor from Omix/ada and then put diamond plate in the rear?

I went to your site and there were no picks of the wheel wells and floor after restoration. If you have some I would appreciate it.

I was looking at your and it seems farther gone than mine and I was considering an aluminum tub for mine. Maybe I should look at trying to save mine befor going the full blown replacement route.

You said that the OMIX/ada floor has everything welded in place. So that means that all you really have to do is go arround the perimeter of the floor with a torch and then clean up the edges. Then you can just weld in the new floor. It sounds like a lot of work but easier than the small patch at a time routine.

Also did oyu have to replace your side plates as well. It looks liek there is a lot of rust at the points where the flares attach. I was just wondering on that point.

I appreciate any more info that you can spare.

Carll
 
I guess it depends how deep you want to go. All thos sot welds joining the floors to the body are a real PITA.
 
But there is a drill bit cutter made for getting rid of spot welds taht work pretty good. I have tried it before and it really helps.

Or are you meaning having to re-do all of those welds. That would be a lot of welding, and on realitiveily thin metal. So I figure that I will have to go pretty slow and jump side to side to let the metal cool, and maybe even have to invest in some sort of copper heat sink to try and spread the heat out so that there is no warpage.

Back about 15 years ago I had to redo the floor pan in a VW. Took the body off and cut the welds. Then there were some spots that had to be chicled and ground down but it really was not that bad. But the welding in of the new floor was to the frame rails and tunnel so I coudl bleed of a lot of the heat to those larger pieces of metal. But then I was using Stick rather than the MIG machine that I have now. So I hope that it will be easier.

Guess that I need to separate they body from the frame and get an honest estimate of how bad the sheet metal is.

Carl
 
I just drilled the spot welds out where i could and used a air chisle on the others! A mig is the way to go because you have more control heat wise minimizing worping! i also hadda create the bottoms of the door pillers using 16 gauge sheet metal! All in all it took 2 days start to finish with plenty of beer breaks with the tub off!
 
With the full legnth floor pans I did it this way.

Removed all bad steel and left an inch or so of the original steel all around. Trimmed my new floors so they would basically sit on the existing remnants of the floor. Used a bunch of angle steel and welded and pop rivited all over. Also installed one new cross brace for the driver side. Used a bunch of body seam sealer then self etching primer. I undercoated everything and it's all very solid. I will be doing Hurculining the whole tub this spring.
 
Back
Top