• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

Getting Ready for 2009 SOA Hot Springs

okjeep

Basic User
City
Tulsa
State
OK
To move the preparation discussions to a better place, what are you doing to be ready for the 2009 nationals?

Bobcat, are you going to wrench 24/7 for 3 weeks to get ready?

Adam's family, are you going to re-build something?

Truck, are you going to show up with a jeep?

I, myself, am in the process of building a D60, detroit, moser alloys, CTM's and getting the engine to run a bit less rich.
 
Well, since you asked, I have to do the following before June 17:

Install Howell Fuel Injection
Install MSD 6A
Install power brakes
Install power steering
Install AM/FM/CB and Firestick
Install rear frame crossmember (Adams Industries)
Install 1" body lift, fix a few body mount brackets
Find a full size spare.
Fix enough rust-through so that the roll bar doesn't fall off on the way there
Install rear slider window
Reupholster seats
Replace lugnuts
Install SOA emblem

I might have forgotten a few items, but hey, so far I have already replaced the spring on one of the windshield wiper arms.
 
okjeep said:
Adam's family, are you going to re-build something?

Who would have guessed that we'd be rebuilding something?!

ry3D400-32.jpg
 
Man,
I'm a slacker :D , I'm aiming for having something to keep the kiddos safe, as I currently have no place for them in the Scrambler, (2-seater only).
 
groundworks3 said:
Man,
I'm a slacker :D , I'm aiming for having something to keep the kiddos safe, as I currently have no place for them in the Scrambler, (2-seater only).

Bungee cords and helmets.:evil:
 
24/7

okjeep said:
To move the preparation discussions to a better place, what are you doing to be ready for the 2009 nationals?

Bobcat, are you going to wrench 24/7 for 3 weeks to get ready?

.

Well I hope not to but that might happen. I've got a lot of work to do on the scrambler.

Rebuild trans,
install twin stick shifters,
B&M auto shifter,
heavy duty steering box mount and brace,
fornt & rear differentital guards,
More bullit proof motor mounts,
hydroboost,
finish installing all new u-joints,
install LED tail lights,
fab tire mount in bed/CB antenna,
cooling fan in cab, (gets just too d##n hot in there)
some kind of new front & rear bumbers (haven't decided on yet)
change paint scheme, (way too many red scramblers)

And whatever comes up between now and then. :confused: Plus I need some warm days to work on the beast(no heat in building)

Don
 
Last edited:
turn a huge pile of parts into a jeep before hand (damn better get going on that)
:eek:
 
Back
Top