Stalled out for a bit here. My welder 'quit' on me with just a little left to finish (tops of the driver side plates, front body mounts, one nut that didn't get a good bead on it), had to fly back to Jersey for a week or so to help tend to my mother (looks like she may have had one or more small strokes...can't walk and has dementia...MRI tomorrow so we can get some answers), and went camping in a cave in Wisconsin with Cub Scouts this past weekend. Gear & locker install is supposed to be on for this Saturday, so I'll load the CJ-7 back up and I guess I'll figure out a way to strap the Scrambler frame up there as well since the guy who's teaching me to do the gears is also a certified welder (he did my 'family' cage and finished my floor). I've got my caliper brackets and rotors for the rear D60-2 and I'm working on something special for my double t-case shifters. I think I'm going to invade the house so that I can get some momentum going again and take over the spare bedroom to assemble the t-cases and some of the other subsystems.

BTW, tell Anders I said hi, too. Don't forget to post those "spy" photos, either. 