Ted Wendel
Jeep nut
- City
- Richmond
- State
- VA
We got Nick's 401 almost ready to go in,a lot to do before Oak Ridge in two weeks,install the engine,transmission,transfer case,both driveshafts have to be made to different lenghts,install wiring harness,gas tank,electric fuel pump,gas lines,some type of exhaust,and other stuff I can't think of.So Mike there may be a spot for your Scrambler at Oak Ridge after all.

, just for a few weeks (yeah, right)...to test it out...yeah that's it....just to test it out. Hmmm....