RobF said:
Congrats!! Keep us posted on the progress!
Will do! It's come a long way since I dragged it down from PA & backed it into the garage.
Completed so far: Motorcraft 2100 carb swap, new aircleaner assembly from a 73 Waggy - with a K&N installed, Accell coil, Ford ignition upgrade, New bumper front with class 1 receiver & rear with class 2 hitch. TJ flares installed on rear, 4.10 gears & Detroit installed, rustproofed the U bolt skid plates while they were off, sway bar disco completed, new driver tilt/slider for seat, new stock clock & tach for a CJ, new heater/vent cables installed, alot of grinding & rust proofing, installed metal "Scrambler" tags on sides, refurbished the swing tire carrier
Still to be done/ completed: Need to complete the 1" BL (PITA 4me), install TJ flares on front (will do last- as this is NOT pressing) need to finish install of 4" lift, need to remove 2 twisted bolts from under passenger seat, waiting for the new windshield frame & glass to be painted/ completed, re-install wipers & motor, body work (still waiting for a rivit gun & metal), install rear seat, weld in the 1/2 cab roll cage, brake work, install AC -
(will wait till next Spring for that unless we get a hot indian Summer) & need to buy/install high volume oil pump.
OH - put cat-muffler-tail pipe on too