Not an attorney but had afriend who's remodel plummer fouled up a big part of the job, she went to the state construction industries dept to go after the contractor's license, got the attention of the prime who really bent over to fix the problem.
 
bigjeepnfool said:
WOW, CONGRATS!!!!! I'd be lying if i told you i wasn't jealous.....You gonna put in some lifts? Also want some pics of the LJ on coilovers:cheers:
-Will


A lift was planned but it will have to be a two poster. The foundation is built for it to go in a certian spot but now with 10" of 3000psi concrete it can go just about anywhere i would imagine. Not sure if I can afford one till next year some time or if i can find a fire sale earlier that may work.

Here is a pic of the LJ for you.

RampPunisher2-1.jpg


RampPunisher-1.jpg


punishwaterfall-1.jpg


punishercrush-1.jpg


bigrock-1.jpg


Latheside-1.jpg




And her is one of my cool Jeep wife going up Mighty Mouse at Trees Ranch

KAt-1.jpg
 
Yaw-sir! Yaw-sir!

Stout that there shop is nothin short of incredable! The only one i have ever seen bigger is nun other than the prime minister himself! He bought a big Ranch in CO with a new (I think I read) 60 x 72 shop. Whatcha got planned for all that space? More Scrambler project builds? I love the pics of your green 8!
 
Curley said:
Stout that there shop is nothin short of incredable! The only one i have ever seen bigger is nun other than the prime minister himself! He bought a big Ranch in CO with a new (I think I read) 60 x 72 shop. Whatcha got planned for all that space? More Scrambler project builds? I love the pics of your green 8!


You got it. First the CJ-10 will roll in. Then I have to repair and sell my Boat. Then I plan to do the '68 Plymouth. After that, so next year sometime, I will do the other Scramblers. I just have to restore stuff. I think I may be a slight be obsessed.:rolleyes:
 
Instead of pouring another 4" of concrete on top, you should consider having an industrial finish put on. I'm not sure what its called. They usually pour the concrete to about an inch from the top of the forms, then pump in a very liquid cement compound. It levels out like water and makes the floor very flat. Would make it nice to lay a frame out on the floor and have it be flat. The tubing guys at my work place use the floor as a flat surface to square from when bending tubing. It's not tubing like you would use for your roll cage but more like your brake lines, but longer with more bends and 50 or so pieces run next to eachother. A normal slab for a house or building will have high and low spots, easy to tell when it rains. We can pour water on the floor in the shop and it does not run anywhere.
 
Shop

Dan i am glad that i am reading this. I will know what to look for when i do my shop next year. Sorry to hear about this misfortune though. Damn the luck.

Good looking jeep though.
 
I am sorry to hear about your contractor troubles. Unfortunately, here in Texas if you can call yourself a contractor then you are instantly qualified. Your General contractor is wholly responsible for the slab. He hired the concrete sub. The concrete supplier and pump company if there was one will be sending you notice by the end of the billing cycle. They will definitely place liens if they are not paid. They will also probably harass you. Other than the poor finish quality and 1-3/4 square issue are there any other problems? If the prep work was done correctly and the steel was properly placed, I would not put 4" on top of the existing slab. You will not have the strength of a 10" slab. The 4" slab will basically float on top of the 6" slab. I would suggest cutting all of the incorrect bolts off flush with the slab. You can use engineer approved anchors to set the base plates for your metal structure. Rarely do I ever put bolts in the slab. Most concrete guys get them wrong. If anything we will use weld plates that are set in the concrete, we then weld the column bases to the plates. If you want to continue working with the General Contractor, then I suggest that you come up with a workable solution for utilizing the existing slab with modified anchors and an industrial top coating that covers the incorrect bolt locations and level out the finish. It is unfortunate that you are in this situation, but you should try to make the best of it and get your building completed as quickly as possible. You will never get enough compensation to offset the additional stress of a lawsuit and the fact that you are unable to use the shop that you have already waited so long for. I would be happy to discuss this further if it would help you out. I am all to familiar with the building process and the day to day problems of dealing with subcontractors......

Later,
Tom
 