• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

Well! were this far!

attached the axles to the frame last nite

plan to pick the tub up from body shop on Friday, will probably have to store it a week or 2 until we get everything back on the frame.

factory stripe kit arrived, so we thought, opened it up and it was for a CJ7, called and got that lined out and received the Scramlber stripe kit this week. Just lots and lots of small stuff to do for awhile.
 
Hopefully Chief Waho will have his scrambler back together soon, then we can double team my scrambler. We will not miss Moab.
 
Moving Right Along

We picked up the tub, hood fenders, doors & misc from paint shop Friday.

They are being stored in my garage at home until the frame is already to go.
Made some pretty good progress on the frame today.

If all goes well we hope to get the motor, trans and t-case in by the middle to end of week.
Still need to put seals in power steering gear box and gaskets and seals in the t-case and get them all painted.
 
Good weekend progress on the Scrambler

Finished up attaching fuel line and brake lines this week end and Sunday evening Chief Waho and I droped in the engine, tranny and transfer case. The only modification so far to my stock `81' Scrambler is the addition of extended front shock towers from an `82' Scrambler, one piece rear axles and went to steering over. Hope to get tub back on this week. Things may go faster now that Chief Waho has his Scrambler back together and even running.
 
We got dads tub back on the frame last nite. Took 6 of us and a 30 pack of cold ones to get it done.
 
Pappy has been busy! Lots of small stuff as you know that really doesn't show up in pictures.

The dash, steering column, shifters, rear wire harness and a few items on the fire wall have been done.
 
Starting to look like a Jeep again! Dad is moving right along!
 
Finally had the old Scrambler running again.
Need to get exhaust on and some fine tuning to the MC2100.
The windshield and front end minus the hood are now on.
Also got all lights functioning.
 
Looking real good. Congrats on the progress.
 
Exhaust is on, sounds pretty good with the 24" glass pack.

The 8 is ready for its new decal kit.

I hope we can get it ready enough to take to the off road park this weekend and give it a little test to make sure all is good.

Still need to get pin striping for around the top edge and get the wrangler half doors back together and on.

Looks like we should have both our Scramblers ready for Moab.
This will be the first National we will have both father and son Scramblers there.
 
dadscj8 said:
what off-road park are you planning to go to this weekend?
K-Rocks it is only about 45 minutes from home.

Probably go Sunday and haul both Scramblers over for a half-day or so just to make sure everything is functioning.
 
The decal kit is on and overall we are very pleased with the results.

We took lots of pictures with measurements before removing the old decals and painting. This helped tremendously in getting the new decals back to their original postions.

Takes a little more patience than I have, glad my buddy Clay came over to help dad out with them. The front fenders are pretty tuff.

Had it out for a test run at our nearby off road park.
If it was mine it would probably never see the trails, it is just to nice.
 
Back
Top