• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

Freedom Steel

Update: Freedom Steel will let me out of the contract for the $1500 that I've already paid...they normally charge 60% (in which case I would not back out). The builder is next on the call list to get an updated quote for the pole building...concrete price from the concrete guy, cost of the fill, cost of the building materials (I stopped in Menards last night to replace a deck post light and swung by the building dept. and spec'd one out, so he's gotta be able to meet or beat that price or build the one I spec'd), labor. Hopefully we can get this back on the rails within a couple of weeks.
 
Cancelled the Freedom Steel contract this morning and gave the builder the deposit for the pole building last night so that he could order the materials to take advantage of a no sales tax special at thr building supply company. Just couldn't afford all of that concrete & associated labor. My wife and I are going to decide this weekend whether or not to try for the variance...that could potentially save us another $6k or more, but of course delays things even more. I'm going to call the zoning inspector to get an idea of how long the process might take.
 
I don't know if we'll ever be able to do it, but we bought our place intending to build a separate shop... reading this makes me dread the idea :eek:

Hope it all works out for you...
 
Just learn from the holes that I fell into ;) Check all of the codes for yourself and make sure that you have subcontractor pricing straight from the horses mouth. Had I done this, I would've chosen the pole building back in May and would be in it by now.

My wife is pretty well peeved at this point and we'd probably just pitch the whole idea, but there's simply not enough room for vehicles, tractors & misc outdoor related stuff without an outbuilding. I brought everything home from work except for two engines, a skid of shelving and leaf springs and my Scrambler and there's just enough room for a path from the garage door to the mud room door...just can't continue to function like this. I can't find anything and most of it is still packed because I have no place to put it. I even have Jeep parts down in the basement on the metro racks that were in the garage in IL (garage here is too narrow for them), stuffed in the back of the CJ-7, and stuffed in the back of the M100 trailer.
 
Decided not to go for the variance...don't want to lose the time and still possibly end up being denied especially since we'd be trying to build within about 4-5 feet of the property line. It's basically just costing us the ~$2k for the fill and associated materials & labor (did I just dismiss $2k like it was pocket change?!?). Not doing a driveway, which trims off almost $2700, saved a couple of bucks by switching from 30' trusses to 40' trusses, eliminating the eaves (steel building didn't have them anyway) which will also save me on soffit, etc, no gutters, saved ~$800 going with a steel roof instead of shingles. Materials are ordered, now just need the updated quote to sign off on and the drawings for the permit.
 
Worked on the drawings Sunday night and made some tweaks this afternoon (needed some material spec's and bumped it up from a 40x30 to 40x32 since 32' made more sense with the 4' spacing on the trusses for the steel roof). I had intended to be an architect in another life before I plopped down in front of a computer for the first time, so it was kinda cool to get back to my roots for a little while (of course I have no idea where all of my cool architectural stencils, pencils, etc are now, so I did the whole thing with a cheapie mechanical pencil and a ruler). Turning them in tomorrow in place of the steel building plans and hopefully will have a permit by the end of the week. Cross your fingers...
 
Plans are turned in, contractor dropped off the manufactured truss diagram this morning, got a call this afternoon about the posts (they didn't look carefully at my wall diagram which has all of the post details, cross section of the footings & cross section of the slab), so I think I'm good to go on the building permit. Just waiting for a call from the electrician for some info I need for the electrical permit. Framing, roof panels & trusses are being delivered on Friday and the utility co's are due out to mark any lines (shouldn't be any) then too. Just might be breaking ground next week.
 
Talked to the electrician this morning and I think I got everything that I needed from him. Did a service mast diagram and service line diagram with all of the wire & ground specs. I'm going to turn this stuff in tomorrow morning while the inspector is there so that I can go over everything with him...hopefully I'll walk out with at least the building permit in hand...we'll see...
 
Happy day!!! I got to the permit office while the inspector was still there, he looked over my tweaks and my new electric diagrams, made a couple of notes, and signed off on them and I walked out with my permits. The footings and framing materials were delivered while I was gone, the trusses were delivered around 1:00 (I still haven't figured out how the guy maneuvered them down the driveway, there's a couple of spots where there is far less than 40' of clear width), and I just got back from a quick errand at the office to find that the phone line was marked (nothing else underground utility-wise as I suspected). Breaking ground on Tuesday...
 
great news. Sounds like you are moving along.

Truck
 
Yup, finally moving along. The builder dropped off his trailer and my boss' Grade-all yesterday and laid out the building so that he could mark for the post holes. Holes were dug this morning and if the inspector shows up early enough (hopefully he's there now) they'll start dropping in the footings and setting posts.
 
Worked on the drawings Sunday night and made some tweaks this afternoon (needed some material spec's and bumped it up from a 40x30 to 40x32 since 32' made more sense with the 4' spacing on the trusses for the steel roof). I had intended to be an architect in another life before I plopped down in front of a computer for the first time, so it was kinda cool to get back to my roots for a little while (of course I have no idea where all of my cool architectural stencils, pencils, etc are now, so I did the whole thing with a cheapie mechanical pencil and a ruler). Turning them in tomorrow in place of the steel building plans and hopefully will have a permit by the end of the week. Cross your fingers...

Glad to hear you have your permit and things are progressing smoothly.

I'll tell you where my architectural tools are - safely buried in the back of a file cabinet. I'll bet I haven't "drafted" anything in 15 years. A mouse and a keypad replaced all that stuff long ago. I still have a drafting table. Makes a nice place to lay prints. The parallel bar disappeared years ago. I do still have a triangle laying around. I use it to slice stuff up nice and neat. LOL.

The worst part is my hand lettering has gone to h@#$. It used to be real purdy.
 
9 footings and 7 posts dropped in yesterday afternoon. I wife said that they were back at it when she left for work around 7:45 this morning so I'd imagine the posts will all be set by the end of today and they may even start on the headers and girts.

OB0901bJPG-1.jpg
 
Last edited:
Glad to hear you have your permit and things are progressing smoothly.

I'll tell you where my architectural tools are - safely buried in the back of a file cabinet. I'll bet I haven't "drafted" anything in 15 years. A mouse and a keypad replaced all that stuff long ago. I still have a drafting table. Makes a nice place to lay prints. The parallel bar disappeared years ago. I do still have a triangle laying around. I use it to slice stuff up nice and neat. LOL.

The worst part is my hand lettering has gone to h@#$. It used to be real purdy.

Yeah, I had switched to CAD several years ago too but figured I could draw them faster than I could get myself back up to speed with a CAD package and get it to do what I want. Most of the easy stuff is geared toward 'normal' houses & garages so you have to fiddle around under the hood to get them to do what you want. My handwriting has always stunk but the lettering for my plans was always nice; I didn't do too badly with it on this go around...must be some muscle memory left.
 
All of the posts are up and the first two rows of wall girts are on. Also started on the fill. Trusses will probably be set tomorrow.

OB0902bJPG-1.jpg


OB0902cJPG-1.jpg


OB0902eJPG-1.jpg
 
All of the girts are on as are the headers for the trusses & for the 9' door. From there they concentrated on the fill since that needs to be done by the end of day Friday.

OB0903aJPG-1.jpg


OB0903bJPG-1.jpg
 
Looking good! I'll bet you can already imagine it filled up with project vehicles, huh? :D
 
Mixed bag for the rest of the week:
I had to make a pickup with the company straight truck on Friday morning, so figured that'd make pickiing up the insulation easier. Stopped by Menards on Thursday night for a few items and swung by the customer service counter to make sure that I wouldn't have any issues on Friday. Well, they now only had 10 sheets of the HD EPS foam in stock. So, I had them check stock in the town where I'd be making the equipment pickup and they had enough to fill my order, so the manager faxed my receipt to them and instructed them to hold the order for me. The owner's son (he's the only one authorized to drive the truck) went with me (he's always up for avoiding work) and we dropped off the insulation at the house.

Then it hit the fan. The building is too close to the overhead power lines. I've got a call into the power company engineer and we'll see what the options are after he comes out to look things over...probably going to have to reroute the lines (iit's the run over to my transformer pole). So, I've got a battle pending with the builder now and my wife is out for blood, especially after the $1500 we lost on the steel building. The builder is in a bit of a pickle because he doesn't get his next payment until the trusses are set. He wabted to come out tomorrow to set the ones that will clear, but I told him that didn't makes sense since we hadn't spoken to the power company yet (never mind that he can't drive the Gradall on top of the EPS & PEX...duh). We have no intention of paying to correct his screw up.

Concrete pour is scheduled for Wednesday, but I'm probably going to postpone that. I laid the vapor barrier and most of the EPS on Sunday, then Monday I cut strips of EPS to insulate the edges of the slab, made a spot for the future lift (removed a 4x12 section of the EPS), mounted a board for the heating manifolds on the rear wall, and started running the PEX. It rained most of the day, so I wasn't able to finish the job...I have one circuit complete by the lift area and about half of the second circuit by that area done. I may come home at lunch time and finish that circuit. The last 3 circuits will be easier since they're just straight runs back to front and I may be able to finish those Tuesday evening. We'll see. I'm going to call the concrete guy to make sure that the rain didn't create any problems...I'm not really trusting the builder at this point for anything more than the actual construction and it won't be his problem in a couple of years when my floor starts cracking because I've got an unstable base.
 
Just have the power company set a second pole near the building with a meter base for the garage.

That way you can have all kinds of power in there to run lifts, welders, and machine shop tools.

Kind of kills two birds with one stone.

Hope things work out quickly.


Carl
 
Just a suggestion when pouring your slab...since you'll have PEX in it, there's always the risk of nicking the tubing if the slab is control cut for expansion. Theoretically the tubing should stay attached to your reinforcing wire, but you never know. Talk to your concrete contractor about these "zip strips"...

http://www.formtechinc.com/other_expansionjoint.htm

We used them when pouring my slab, worked out nicely. Bit of a pain to work with, but no risk of damage with these. They also pressurized the PEX circuits & kept an eye out for pressure drop during the pour...ya just never know, a wheelbarrow or shute could always pinch or sever the PEX, they get much heavier when filled with concrete ;)
 