Mixed bag for the rest of the week:
I had to make a pickup with the company straight truck on Friday morning, so figured that'd make pickiing up the insulation easier. Stopped by Menards on Thursday night for a few items and swung by the customer service counter to make sure that I wouldn't have any issues on Friday. Well, they now only had 10 sheets of the HD EPS foam in stock. So, I had them check stock in the town where I'd be making the equipment pickup and they had enough to fill my order, so the manager faxed my receipt to them and instructed them to hold the order for me. The owner's son (he's the only one authorized to drive the truck) went with me (he's always up for avoiding work) and we dropped off the insulation at the house.
Then it hit the fan. The building is too close to the overhead power lines. I've got a call into the power company engineer and we'll see what the options are after he comes out to look things over...probably going to have to reroute the lines (iit's the run over to my transformer pole). So, I've got a battle pending with the builder now and my wife is out for blood, especially after the $1500 we lost on the steel building. The builder is in a bit of a pickle because he doesn't get his next payment until the trusses are set. He wabted to come out tomorrow to set the ones that will clear, but I told him that didn't makes sense since we hadn't spoken to the power company yet (never mind that he can't drive the Gradall on top of the EPS & PEX...duh). We have no intention of paying to correct his screw up.
Concrete pour is scheduled for Wednesday, but I'm probably going to postpone that. I laid the vapor barrier and most of the EPS on Sunday, then Monday I cut strips of EPS to insulate the edges of the slab, made a spot for the future lift (removed a 4x12 section of the EPS), mounted a board for the heating manifolds on the rear wall, and started running the PEX. It rained most of the day, so I wasn't able to finish the job...I have one circuit complete by the lift area and about half of the second circuit by that area done. I may come home at lunch time and finish that circuit. The last 3 circuits will be easier since they're just straight runs back to front and I may be able to finish those Tuesday evening. We'll see. I'm going to call the concrete guy to make sure that the rain didn't create any problems...I'm not really trusting the builder at this point for anything more than the actual construction and it won't be his problem in a couple of years when my floor starts cracking because I've got an unstable base.