- City
- God's Country
- State
- AR
Paid for an OEM 20 gal tank several months ago from a guy in Central Arkansas. Finally stopped by to pick it up this weekend.
I already had a 20 gal skid and tank in good condition to eventually put into the Scrambler, but it was missing the little flap/mounting bracket thingy on the passenger side of the skid. I have 20 gal tanks on both of my CJ-7's too. I like the extra capacity and not having to worry about rust.
This tank was cheap, tank appeared to be in good shape, had the getting-hard-to-find strap, rubber mats, and that little bracket I needed, so I grabbed it. From the pics I originally thought the skid would be scrap, but looking at it I think it could be fixed fairly easily by simply welding in some new steel. It's all solid except the middle right in the back where it bolts up.
It was missing the sending unit, but I have a new one of those on the shelf already. Looks like I'm gonna need the big plastic nut that holds the sending unit in place though. Luckily Raymond posts really good pics so I know exactly how it should look when I'm ready to install it!
Gas gauge on my green CJ7 isn't working, so think I"ll clean up this tank, put new lines and the new sending unit in it, and then just swap them out.
Need to get this thing cleaned out though. I can hear debris in there, and it reeks of bad/stale gas.
What's the recipe for plastic OEM tank? BB's and simple green? Chain and water?
Next, when I'm ready to swap one of these into the 85 Scrambler that is currently holding the OEM 15 gal tank, are the vent/fill hoses still unobtainium or has someone started making reproductions? I remember the subject being discussed here in the olden days, but wasn't sure if things ever changed. Hopefully @spankrjs recently looked into this with JA's restoration.....
I already had a 20 gal skid and tank in good condition to eventually put into the Scrambler, but it was missing the little flap/mounting bracket thingy on the passenger side of the skid. I have 20 gal tanks on both of my CJ-7's too. I like the extra capacity and not having to worry about rust.
This tank was cheap, tank appeared to be in good shape, had the getting-hard-to-find strap, rubber mats, and that little bracket I needed, so I grabbed it. From the pics I originally thought the skid would be scrap, but looking at it I think it could be fixed fairly easily by simply welding in some new steel. It's all solid except the middle right in the back where it bolts up.
It was missing the sending unit, but I have a new one of those on the shelf already. Looks like I'm gonna need the big plastic nut that holds the sending unit in place though. Luckily Raymond posts really good pics so I know exactly how it should look when I'm ready to install it!
1984 SL Restoration
I agree that shimming behind the bearing would be a better option, if you knew about the end-play issue ahead of time. With the outer shim method, I'm a little concerned that the bearing retainer could rub on that shim. It's unclear from the photos whether or not the bearing retainer clears...
www.cj-8.com
Gas gauge on my green CJ7 isn't working, so think I"ll clean up this tank, put new lines and the new sending unit in it, and then just swap them out.
Need to get this thing cleaned out though. I can hear debris in there, and it reeks of bad/stale gas.
What's the recipe for plastic OEM tank? BB's and simple green? Chain and water?
Next, when I'm ready to swap one of these into the 85 Scrambler that is currently holding the OEM 15 gal tank, are the vent/fill hoses still unobtainium or has someone started making reproductions? I remember the subject being discussed here in the olden days, but wasn't sure if things ever changed. Hopefully @spankrjs recently looked into this with JA's restoration.....
