I sure hope so! It seems like just as I get a big step done something comes up and then it sits for a month or two before I get back to it!
Now that the frame is painted I can start installing a lot of the parts I've had sitting around taking up space! I've had my Rubicon Express 4.5" lift sitting in my garage since shortly after I acquired my Scrambler just waiting for this day to come! I will start with installing it. I also just got all my new stainless brake and fuel lines so I can begin installing those as well. I still need to order my gas tank skid. I'm not sure which one I'm going with yet. I'm thinking FourXDoctor but I haven't been able to get a hold of them on the phone, I assume because they are at Easter Jeep Safari. I will try again this week. If not them then it is between Kilby and Genright. Hopefully this will move along a little faster now but I have a big speed bump looming in May!