Well, just to make BigWalton happy, I decided to build a flatbed this weekend. I figured it would be really nice in Hot Springs to have the functionality of the flatbed as well for tieing down a cooler and parts bin...so that was thrown into the mix of the decision as well (sorry Eric).
Anyway...I got a bunch of scrap wood from a neighborhood that is being built nearby (it had nails and stuff in it and was in the trash bin at each house) to try and cut down on the costs. Plus, I had some stuff laying around the garage that I could take back to the Depot anyway. So after getting the hardware I am using to tie it into the frame into the back...I'm about 4 or 5 bucks POSITIVE on the project so far
.
I'm doing this the real quick and dirty way...well as quick and dirty as I could think up. I'm laying 4 boards width ways on the Scrambler...one at the rounded cross member around the middle of the Jeep...one at the highest point on the frame above the fuel pump...and 2 on the back section of the frame. At this point I have them laying on there right now and secured to the frame.
So for today I need to run "joists" the length of this thing...2 or maybe 3...and then figure out what I am doing for the top. And then get it all level with the scrap wood.
Just thought I would tease you guys that are on here this weekend. I'll get some pics up today for sure.
Anyway...I got a bunch of scrap wood from a neighborhood that is being built nearby (it had nails and stuff in it and was in the trash bin at each house) to try and cut down on the costs. Plus, I had some stuff laying around the garage that I could take back to the Depot anyway. So after getting the hardware I am using to tie it into the frame into the back...I'm about 4 or 5 bucks POSITIVE on the project so far
.I'm doing this the real quick and dirty way...well as quick and dirty as I could think up. I'm laying 4 boards width ways on the Scrambler...one at the rounded cross member around the middle of the Jeep...one at the highest point on the frame above the fuel pump...and 2 on the back section of the frame. At this point I have them laying on there right now and secured to the frame.
So for today I need to run "joists" the length of this thing...2 or maybe 3...and then figure out what I am doing for the top. And then get it all level with the scrap wood.
Just thought I would tease you guys that are on here this weekend. I'll get some pics up today for sure.