Another month gone by and another update with no pics. Been having a wonderful time...the highlights:
1) Went to a client's new home to setup their office only to find out that they actually wanted me to setup their new furniture in addition to the network & laptops...1 hour job turned into a full day affair capped off my the window regulator on my wife's Durango breaking...in a rain storm.
2) Put the Durango in the shop for the regulator and have them do the 60k maintenance while they have it and they also replace the radiator hoses. Get it back a couple of days later and it overheats on Saturday on the way to watch a demolition derby. 2 weeks later after a bunch of dancing around, arguing & yelling we get it back with the top end of the engine rebuilt (aluminum heads warped, trashed valve guides, trashed valve & lifter).
3) Comcast terminated my account for excessive bandwidth use...lost my internet connection and all e-mails that I hadn't downloaded (as well as my wife's e-mails).
4) Window motor on the ZJ broke.
5) I was given the 'opportunity' at work to take a position with another department. The problem...it's rotating shift work. Right now I'm on 2nd shift (3PM - 11PM) so I see my wife for 1-2 minutes as she leaves in the morning and see my son for about an hour as I get him up for school and walk him down to the bus stop. Two more weeks of this, then I rotate to 3rd shift (11PM - 7AM) for two weeks and don't see my wife in the morning, still see my son, try to sleep during the day, and have dinner with them before I leave for the office. The extra special treat? The Friday 3rd shift can't leave on Saturday morning until all of the batch jobs have completed, so I could easily get stuck here until noon...there goes my weekends. Then I'll rotate back to my normal hours for a few weeks...don't know how long or what the next rotation looks like as the schedule is made up two months at a time, so who knows what else is going to get screwed up here. I definitely won't be able to take a welding class now.
So, between weekend obligations and only having one vehicle, I didn't make it back up to Anders' place until last weekend and then only got to spend a couple of hours because I had to take care of a bunch of stuff for one of my clients. We ran through a rough outline/schedule to try to wrap things up up there by the end of October (he has to work on other rigs outside since mine is inside), talked about relocating the gas tank, and took the final measurements for seat placement within the cage.
I made it back up again this past Sunday for a few hours and removed the second to last frame crossmember. We're also going to remove the body channel and mounts above that and replace the channel with a 'normal' reinforcement ridge and replace the body mounts with frame tie-ins for the rear of the cage. The gas tank will be moved about 1 1/2" higher and a couple of inches further back. We'll put a new crossmember in mounted further back. The fancy belly crossmember is gone. Too much of a headache to make everything work & fit right. I also unclocked the 203 range box...again, too much of a headache and too many hoops to jump through...KISS...only costs me about an inch of ground clearance from where things sat with it clocked up, but it's still better clearance than stock and I'm going with a taller tire than originally planned so I don't think it'll be an issue. A cross tube wil be placed below the 300's rear output instead of between the 203 & 300 (the driver side frame bracket for the old tube will be re-used to mount a torque arm) and another will be placed below the mounting pad on the transmission. Those two will be tied together, then the front tube and the crossmember under the engine will be tied together utilizing removable inline tube clamps. Not as cool looking, but it'll do the job much better. I'm planning to head up again this coming Sunday...hopefully there'll be some photo-worthy progress (Anders is supposed to work on the seat mounts this week) afterwards. In the meantime I'm trying to wrap up some stuff for a couple of my clients so I can free up my daytime hours to get the garage back in shape. Got rid of some shelving units and started putting in some old kitchen cabinets...need to find a few more and get a countertop.