• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

Rewind

I'm just giving you a hard time. I was guessing when it all started and was thinking it was around the time I got mine. I remember it started as a CJ7 and then at some point you got the scrambler tub and then grafted the wrangler to it. What happened to your website?

AFA the 60-2, thanks. I was frustrated when I got the axle the lack of info on the net and the fact that what was out there was conflicting. I'm fortunate enough to have a 66-77 dana spicer book so I have all the part numbers. I think I got the service manual from someone on POR and the discs were just parts I had lying around. I should do a cost breakdown but it ended up costing less than the 44 swap I did a few years ago, mainly because of the disc brakes.
 
Yeah, it's coming up on 7 years...my how the time flies. I started with a CJ-7, then bought the remains of the Scrambler and sacrificed the CJ-7 to the cause including trading the frame for the YJ tub that I used for the graft. The web site has moved and changed domain names a couple of times...it's at http://www.jeepskate.net and should stay there for the forseeable future.
 
Well, this weekend stunk. Had my day all planned out (first mistake) and it all went to pot. Headed up to a client's home office Saturday morning and got stuck there 2 1/2 hours longer than planned, so Anders had to leave and put my wheels and a spare for Grub outside for me and I swung up there real quick and picked them up, then headed down to the client's office to do some more work. Got to Grub's place a little before 8 PM (I left my house a little before 8 AM!!) and gave him the spare and helped him drop his cage back in (removed it to paint it and Durabak his tub). Had to run back up to the office Sunday to finish up a couple of things (plus I had done some work via remote access late Saturday night/early Sunday morning), then came home and converted the lawn tractor from winter dress (plow, chains, weights) and put the mower deck on it and cut the grass. Went across the street to a neighbor's house to see how he was coming along with a picket fence he was putting up and ended up over there until 7 PM (Why do people who don't have any tools to speak of try to do home improvement projects? I spent half the time walking back and forth between his yard and my garage getting tools...he didn't have a level or a saw...darn thing looked like an Englishman's teeth until I conviced him to pull most of it down and start over). On the plus side, I made a nice chunk of change to help finance completing the Scrambler, and I played hooky from work yesterday, pulled my 8274 out of the corner of the garage, dusted if off and got it working. Anders won't be around next weekend and I have Cub Scout stuff the following weekend, so there won't be much to report for a couple of weeks. I'll probably take the down time to paint the wheels and tend to the CJ-7.
 
Last edited:
Geesh...another whole month!! Memorial Day parade coming up, then I'm done with Cub Scouts for the most part until September, and most of my big ticket stuff for my clients is just about done. Got back up to Anders' place for a short day on Saturday. Test fit some 38's (*plenty* of room for them, just have to stick with a narrow width, trim the rear wheelwells a bit which was already in the works, and nudge the rear axle forward a bit when we setup the perches which I had to do anyway since I'm running different springs from the original build), broke out the plasma cutter (what a joy once I got the hang of it...definitely adding one to my tool wish list) and removed the flange around the rear wheelwells and removed the wheelhouses, then test fit & tweaked some Jeep-style trailer fenders to replace them. Next trip up we'll get them tacked in and I'll remove a little more sheetmetal from the opening to match.

8wellout1JPG-1.jpg


8wellout2JPG-1.jpg


We also took the cage out and set it on the work table so that Anders could finish up the rear section. He'll get that back in over the next couple of weeks and get going on the front section.

xcageout1JPG-1.jpg
 
I like the idea of trailer fenders for the inner fender. I may have to look into them.
 
Didn't get a chance to post these before I went on vacation.

Rear portion of cage re-installed:

xtrmrcage1JPG-1.jpg


xtrmrcage2JPG-1.jpg


Modified 'Jeep style' trailer fender in place of stock wheelhouse:

trlrfndr1JPG-1.jpg
 
Nice!

Where did you get the clamps on the rear cage? They look like the ones Rockhard uses. Or is this a modified Rockhard cage?
 
Went back up to Anders' place this past Saturday and we made a little more progress. I swapped out the front 'Heinz 57' spring packs with some Blazer rear packs and was able to put the shackle hangers back in the stock position and bolt on the front bumper. They're the exact 52" length that I was chasing so the geometry is right now, but I need to move the axle 3"-4" forward on them (the pins are centered at 26"). The rear of the cage is complete except for the seat & harness mounts, and we started on the front of the cage. I also reversed portions of the lip on the trailer fenders that we're using for the new rear wheelhouses so they'd fit better, and installed the 4xDoc gas tank skid so we could see what we were working with for clearnce between it and the Dana 60. The 60 will have to be mounted using the rearmost holes in the new perches and we're going to look at modifying the frame crossmembers to move the tank up & back a couple of inches. During the week, Anders had built the B-hoop frame tie-ins and is working on finishing up the A-hoop tie-ins.

DCP_1493.JPG


DCP_1494.JPG


DCP_1495.JPG


DCP_1496.JPG


DCP_1497.JPG
 
Last edited:
Not a ton to report as my last couple of trips up have only been partial days mostly spent tweaking. I moved the front axle forward about 3 inches (just butted the spring perches up against the center pins to see how it would sit before committing to drilling any holes) and it sits about right now. We put the laundry list of remaining to-do's on a whiteboard so Anders can pick off some of the small stuff when he doesn't have time for bigger things and to help keep us on track. We decided to leave the rear axle where it is and just re-work the gas tank location to get the clearance that we need. This past Saturday I put the Crusher Corners back on so that they'll hold the sides in place for welding the new wheelhouses in. I also pulled the rear spring packs (they were way too flexy) and slipped in a couple of leaves that I removed from the Heinz 57 packs that were on the front. Still flexy, but not so sloppy loose. Doing family stuff and taking care of things around the house this weekend, so I'll probably head back up the following weekend and get crankin' on the front of the cage again. Also picked up a JB Conversions HD rear output for the 300 while they were on sale the last few days and am selling off my Tera HD rear output along with an extra Dana 300 I picked up with a spare trans for my CJ-7.
 
When you move the front forward 3", how are you going to mount your steering box? I'm assuming (I know) that you plan to move it forward 3"+. Are you extending the frame?
 
The Blazer springs are 52" long with the pin centered at 26", so the axle is sitting about 4" back from stock position...moving forward 3" puts it closer to stock (I may still go 4") and I don't need to move the box or extend the frame. This (finally) gets it sitting the way I had intended in the first place.
 
Another month gone by and another update with no pics. Been having a wonderful time...the highlights:

1) Went to a client's new home to setup their office only to find out that they actually wanted me to setup their new furniture in addition to the network & laptops...1 hour job turned into a full day affair capped off my the window regulator on my wife's Durango breaking...in a rain storm.

2) Put the Durango in the shop for the regulator and have them do the 60k maintenance while they have it and they also replace the radiator hoses. Get it back a couple of days later and it overheats on Saturday on the way to watch a demolition derby. 2 weeks later after a bunch of dancing around, arguing & yelling we get it back with the top end of the engine rebuilt (aluminum heads warped, trashed valve guides, trashed valve & lifter).

3) Comcast terminated my account for excessive bandwidth use...lost my internet connection and all e-mails that I hadn't downloaded (as well as my wife's e-mails).

4) Window motor on the ZJ broke.

5) I was given the 'opportunity' at work to take a position with another department. The problem...it's rotating shift work. Right now I'm on 2nd shift (3PM - 11PM) so I see my wife for 1-2 minutes as she leaves in the morning and see my son for about an hour as I get him up for school and walk him down to the bus stop. Two more weeks of this, then I rotate to 3rd shift (11PM - 7AM) for two weeks and don't see my wife in the morning, still see my son, try to sleep during the day, and have dinner with them before I leave for the office. The extra special treat? The Friday 3rd shift can't leave on Saturday morning until all of the batch jobs have completed, so I could easily get stuck here until noon...there goes my weekends. Then I'll rotate back to my normal hours for a few weeks...don't know how long or what the next rotation looks like as the schedule is made up two months at a time, so who knows what else is going to get screwed up here. I definitely won't be able to take a welding class now.

So, between weekend obligations and only having one vehicle, I didn't make it back up to Anders' place until last weekend and then only got to spend a couple of hours because I had to take care of a bunch of stuff for one of my clients. We ran through a rough outline/schedule to try to wrap things up up there by the end of October (he has to work on other rigs outside since mine is inside), talked about relocating the gas tank, and took the final measurements for seat placement within the cage.

I made it back up again this past Sunday for a few hours and removed the second to last frame crossmember. We're also going to remove the body channel and mounts above that and replace the channel with a 'normal' reinforcement ridge and replace the body mounts with frame tie-ins for the rear of the cage. The gas tank will be moved about 1 1/2" higher and a couple of inches further back. We'll put a new crossmember in mounted further back. The fancy belly crossmember is gone. Too much of a headache to make everything work & fit right. I also unclocked the 203 range box...again, too much of a headache and too many hoops to jump through...KISS...only costs me about an inch of ground clearance from where things sat with it clocked up, but it's still better clearance than stock and I'm going with a taller tire than originally planned so I don't think it'll be an issue. A cross tube wil be placed below the 300's rear output instead of between the 203 & 300 (the driver side frame bracket for the old tube will be re-used to mount a torque arm) and another will be placed below the mounting pad on the transmission. Those two will be tied together, then the front tube and the crossmember under the engine will be tied together utilizing removable inline tube clamps. Not as cool looking, but it'll do the job much better. I'm planning to head up again this coming Sunday...hopefully there'll be some photo-worthy progress (Anders is supposed to work on the seat mounts this week) afterwards. In the meantime I'm trying to wrap up some stuff for a couple of my clients so I can free up my daytime hours to get the garage back in shape. Got rid of some shelving units and started putting in some old kitchen cabinets...need to find a few more and get a countertop.
 
Had a prety productive day up at Anders' shop. I brought the Dana 300 home with me (need to finish removing the front output bearing cover to take back up for him to machine on his new lathe for the JB conversions bearing) last weekend and brought back the empty case that all of my JB & AA goodies are going into with the AA clocking ring and JB rear output housing bolted to it (much easier to wrangle while settling on clocking positions). Ended up using the second clocking position which puts the pan nearly flat and we're not hitting the floor like before with the 203 clocked...there's actually enough room to jack the drivetrain up and get back the inch I gave up and then some...we'll see what pans out there. Also with the return to the unclocked 203 setup, I can run the stock CJ trans mount/torque arm setup. I finished up the angle iron that Anders had cut for reincorcing the winch mount/bumper from some scrap I spotted that he was about to toss and he welded them on and I brought the bumper home to prep & paint. We revisted the seat mounts again as he started working on the tubes for them and ended up raising the seats a couple of inches from where we had them last week in order to clear the floor pan next to the trans tunnel. Planning to finish up the cage when I go back up in a couple of weekends and bring it home with me. Then we'll remove the tub and make the mods for the gas tank relocation and fix the body mount brackets that are out of spec.

DCP_1491JPG-1.jpg


DCP_1492JPG-1.jpg


dcp_1493JPG-1.jpg
 
Another month gone by (had to cover half of 3rd shift for a week, then was on 3rd shift for a few weeks which essentially left me with 1 day weekends) and another update with no pics...had to hit the road to finish up some work for a client but I'll get some next week.

The front seat mount tubes are done. Ended up having to cut the Mastercraft slider off of the driver seat and we'll just tack some flat stock to the bottoms of the seats and mount them on standard YJ sliders. Anders was working on modifying the TJ rear seat brackets to mount to the cage when I left. Hopefully he'll be able to keep cruising this week and get the seats & harnesses mounted, then the cage can be pulled out and finish welded and we can move on to the rest.
 
Went up to Anders' place again on Saturday. The cage itself is basically done at this point, just need to finish the seat & harness mounts and finish weld it. We went back & forth on doing door bars a month or so ago and I finally sat in the rig and we figured out placement that would work and fit.

dcp_1494JPG-1.jpg


dcp_1495JPG-1.jpg


dcp_1496JPG-1.jpg


dcp_1497JPG-1.jpg


dcp_1498JPG-1.jpg
 
Forgot to grab the darn camera this morning. :mad:

Rear seat is mounted (welded the factory TJ front brackets to the cage, then cut the rear C's off of the factory brackets and welded them to some plates which were in turn welded to the cage), driver seat is mounted with a factory YJ slider, I brought the slider for the passenger side up today and got it marked & drilled so it's ready for bolting/welding. Worked out the positions for the harness mounts (I have DOT-legal Scrothe ASM harnesses for the front and bought double-shear mounts for the ends, and RJS harnesses for the rear which I need to buy snap mount rings for to finish installing). Settled on the final position for the drivetrain and will be able to re-use the crossbar from the first mock-up/setup and positioned the rear axle and tacked the spring perches in place. We ended up needing to move the gas tank further back than we originally thought, so the big body crossmember with the body mounts behind the gas tank is gone as are the two body mount brackets...the C-pillar cage tie-ins will go in place of the body mount brackets after the frame is reinforced with additional plating from that area rearward. Rather than replace the body channel (there's still a littl of it left to maintain from rigidity), we're going to add an addition tube to the rear of the cage to function as the cargo floor. There's already a tube that runs across near the bottom that leave about 12" between it and the tailgate, so this will actually make the space more useable than it currently is...I'll have to find some fine steel mesh to plate it with and incorporate some cargo tie-downs.

I'm heading down to Disney/EPCOT, etc at the end of the week, then I'm on third shift when we get back, so I won't be back up again until Thanksgiving weekend, but Anders has enough worked out to keep cruising.

-Rodney
 
Back
Top