• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

This may be my next project

Challenger

Legacy Registered User
SOA Member
City
Loveland
State
CO
This is the one that was up in Fairbanks AK. We bought it from the guy and had it shipped down, took only five weeks but it is here now. Linda talked me into restoring it back to the original postal colors along with a little of my modifications. He was nice enough to throw in a second set of postal doors. The hard top is in great shape.
 
It's about time you finally got some pic's posted.
You need to post pic's for every step of the build.

That's the way we are leaning towards going with on our postal. Document everything so it will be easier on us when we get around to ours.
 
WOOT!!! :bow:

We need more pics! Looks like a great start. I always thought I'd do some take off on the USPS paint job/stripes if I ever painted mine full-on.

Can't wait to see it happen!
 
Looks good!


Were all these postals automatics? I am assuming that the cooler on the front is for an automatic.
 
Oh Yes

This rebuild will definitely have pictures. Yes bigwaiton the foam is still in the back. Waiting for summer to get here. Todd
 
mssldn said:
Were all these postals automatics? I am assuming that the cooler on the front is for an automatic.

Yes...
 
Challenger said:
This rebuild will definitely have pictures. Yes bigwaiton the foam is still in the back. Waiting for summer to get here. Todd

THAT'S WHAT I'M TALKIN' ABOUT!!!!

Ahh, foam! One day I'll bother getting it all off the tub sides. Never cared enough to go there after the hell that was de-foaming the top :banghead:

Don't wait too long... I did mine in the summer and it turned into a foam-air filled sweatbox! I'd much rather do it in cold/cool weather!
 
did someone say foam?

Pictures002-1.jpg


Pictures009-1.jpg
 
Back
Top