- City
- Rome
- State
- GA
For the past 6 months I've been planning my next project for the jeep. Over the past couple of years I have slowly been building up my 8, 2 years ago I replaced the tired worn out 258 with a fresh one, and last year I did an axel swap and lift. So what was I going to do this year?
Well after about 7 years of getting my leg wet every time it rains, watching some pin whole size rust spots go into ones as big around as a pencil, getting clipped by a truck, 22 years of use by me and other owners, and the wife getting a new car (we kept her old one the 8 has been my DD for the past 7 years) I decided to commit to a frame off this summer's project.
For the past 8 days I have been slowly disassembling, photographing, labeling, and video taping. About Noon today I finally had the body removed from the frame and rolled the chassis out from under it.
If every thing goes as planed I hope to have it back together and on the road/trail by the middle of September, tested and ready for the Dixie Run at Tellico the first of October. (Man, I'm worried about that dead line)
The project includes stripping the body, replacing/repairing rusted panels, coating chassis and body with POR (I do not want to have to do this again in 20 years), coating the tub from tailgate to firewall in durabak top and bottom, installing diamond plate corner panels (off your rocker), and a few other things (define few)
As of 4:30 EST this afternoon this is what my 8 looks like:
Well after about 7 years of getting my leg wet every time it rains, watching some pin whole size rust spots go into ones as big around as a pencil, getting clipped by a truck, 22 years of use by me and other owners, and the wife getting a new car (we kept her old one the 8 has been my DD for the past 7 years) I decided to commit to a frame off this summer's project.
For the past 8 days I have been slowly disassembling, photographing, labeling, and video taping. About Noon today I finally had the body removed from the frame and rolled the chassis out from under it.
If every thing goes as planed I hope to have it back together and on the road/trail by the middle of September, tested and ready for the Dixie Run at Tellico the first of October. (Man, I'm worried about that dead line)
The project includes stripping the body, replacing/repairing rusted panels, coating chassis and body with POR (I do not want to have to do this again in 20 years), coating the tub from tailgate to firewall in durabak top and bottom, installing diamond plate corner panels (off your rocker), and a few other things (define few)
As of 4:30 EST this afternoon this is what my 8 looks like:


