Freedom Steel

When they did the floor for my garage they put in a "Metal Key Way", to screed against. It is a 30'x30' solid pour. It has basically a cross pattern for the key way. That way they could screed to the edges of the block wall foundation.

http://www.masco.net/catalogs2/concrete_forming_accessories/slab_horizontal/screeds.htm

The nice thing is that with the very small gap at the top was filled in with cream from the pour and it looks like a nice single solid floor. They key shape keeps the floor from shifting up and down but allows sideways movement. This way any small cracks will be at the Key Way joint.

Well that and 8 loads of #57 stone below the conc. will keep it from moving.

But if the Conc. guys are good they will be out there to install this just before the pour.

If I had to do the entire floor pour again I would god for a dead flat floor. Right now it is sloped 1/8" to the foot. It is OK but throws stuff off if in the future I want to build a frame off of the floor I have to level it first.



Carl
 
Thanks for the tips. What I'm doing is stapling my PEX to the EPS so that it's at the bottom of the slab, mesh goes over the top. That should help protect the tubing from the concrete guys and keep it out of the way of the joints. I'll be pressurizing the system after I connect the tubing to test it and will then drop the pressure to help keep it from compressing during the pour and to watch for damage.

The power company engineer came over at lunch time. He said it's the worst OHSA violation he's ever seen and that it's lucky that no one was killed. Power company requires a 10' easement with the line at the center and OHSA requires 12' clearance for *everything* including the workers, tools, equipment, etc. He told me that if the builder balks at paying to move the lines, he'll definitely be on the hook for multiple fines if I file a complaint. He's recommending dropping a pad transformer near the pole that my service is on then running new service to it underground and switching me over to that, then they'd pull the pole & transformer and give a rebate for those since they can re-use them. The builder can dig the trenches and run the conduit himself to save on those costs (engineer will give him the specs). I'll have the quote tomorrow, then it's sit down time with the builder.

Concrete guy said no problem on the pour, the weight of the concrete will push the water out from under the EPS.
 
The builder got the 'prelude' this evening when he called to find out what was going on. His response to the 10' easement and 12' OSHA regulation was 'I didn't know." "Well, Bob, as the contractor you're supposed to know these things, it's a federal regulation...even the engineer immediately said that you're supposed to know." I then told him about running new service underground and that he could trench it, etc and the engineer would give him the specs. He then asked "Who's paying for the transformer?" I said. "You are." After protesting further that he couldn't afford to pay for it and that he didn't know, he then asked if I'd split the costs with him. "We'll talk tomorrow, Bob." I'll let him stew on it tonight and see what the costs are tomorrow.
 
He's insured/bonded right? I bet there's a couple people there that might be interested in the fact that he "didn't know" about this little tidbit. He's got a boatload more than the cost of this job or fines at stake... figure it's obvious and you know that, but just had to throw it out.

There's no way you should be paying for any of this BS.
 
Do you have Ohio Edison? When we built, they had a program that if a set number of kilowatt hours were consumed each billing cycle, they put the pad transformer on a "payment plan" I think for five years...of course our bill never fell under the minimum requirement, & we never paid anything additional for the equipment. Couldn't hurt to ask, I know they discontinue programs all the time, this was in 1997.
 
He's insured/bonded right? I bet there's a couple people there that might be interested in the fact that he "didn't know" about this little tidbit. He's got a boatload more than the cost of this job or fines at stake... figure it's obvious and you know that, but just had to throw it out.

There's no way you should be paying for any of this BS.

Yes, he's insured/bonded. I'm hoping that he's smart enough to realize what's at stake for him and that the cheapest & easiest route for him is to take the hit from the power company. He's already out of pocket at this point...pretty much all that I've paid for are the building construction materials. He's paid his workers, bought fill & gravel, etc and doesn't get another cent from me until the trusses are set (and of course they can't be set until the lines are moved). I'll pay to move the lines, but that amount comes off of his bill. If he wants to walk, then I'll report him and pay someone else to finish the building (which might actually be a little cheaper than paying him to finish the job since the building is basically erected for free at this point).

Do you have Ohio Edison? When we built, they had a program that if a set number of kilowatt hours were consumed each billing cycle, they put the pad transformer on a "payment plan" I think for five years...of course our bill never fell under the minimum requirement, & we never paid anything additional for the equipment. Couldn't hurt to ask, I know they discontinue programs all the time, this was in 1997.

I have AEP. The engineer told me that they do not start the work until the paperwork is signed and the check clears, so it doesn't sound like they take payments. I'm not paying it anyway ;)
 
Last edited:
I spoke with the engineer a bit ago and after he got back to the office and hashed things out with the other engineers and crunched the numbers, they decided to nix the pad transformer and underground service in favor of sinking another pole so that they can re-run the overhead wires behind the building in line with the transformer pole. Just shy of $2200. So, we'll let the builder know that and that we'll deduct that amount from his last payment. I already have the ball in motion with AEP to get the papers to me to sign and send back with the payment so that they can get me scheduled. The engineer will be out this week to mark where the new pole will go.
 
Dang, it is always something. I can't get a garage door guy to put a spring on mine to save my life. I've had several out and they've all flaked out on me. I would really like to be able to open my garage door and take something into the shop....

Truck
 
Looks like I'll have the papers from AEP in my hands tomorrow. Apparently the builder must've been stewing all night and he called AEP this morning to setup a meeting for tomorrow morning to argue with the engineer about the underground vs. overhead. Of course he called before the engineers had decided what they were doing, so he has nothing to argue with them about tomorrow. He'll be over tonight for us to talk to him and get this mess settled. This will probably set me back another 2-6 weeks, so we might be squeaking in before the first snowflake.
 
Holy frijoles!!! 4 hours later and I am still fuming mad. The unbelievable nerve of this guy. He said he had a bunch of stuff to do but would be over late and would call about an hour before he expected to arrive. Well, about 6:00 I'm sitting at the kitchen table looking over Brendan's homework and my wife looks out the front window and says that Bob is down at the building. He's got his dump truck backed in with the trailer hitched up and is loading up some of the leftover gravel & fill and the front end loader. We figure he'll be back later, so my wife leaves me to watch dinner so that she can take a shower and a few minutes later I see him at the front door with paperwork rolled up in his hand. I let him in and comment that he was supposed to call first, we're in the middle of stuff and my wife wanted to be present. We sit down and he asks me if I had the number from AEP (I had typed up a little contract addendum for us to sign with the amount on it, so I flipped open the folder and told him the amount). He exclaims that he thought that's what it'd be (I suspect that he called AEP back and got the amount), unfurls the new quote (which once signed becomes a contract...up to this point I have not signed a contract with him since we changed things from the original quote) followed by an invoice where he has conventiently broken out that my bump from a 30x40 to a 32x40 cost $1544 (I suspected that he would try to pad and had purposely avoided telling him the AEP costs in advance). He then asks me to split the AEP costs with him. I tell him no, that I don't have any extra money left, and that this was his mistake and he's responsible for paying for it. He then informs me that *I* am the general contractor, I drew up the building & electrical plans (lighting & receptacle layout & service entrance diagram...absolutely nothing to do with where the overhead wires were located), so some of the fault is mine. About this time my wife stepped out of the shower and she heard my voice starting to boom (I normally talk fairly quietly, but when I get louder, my voice resonates and shakes the walls) and figured that I couldn't be talking to Brendan like that over homework and something must be going on. I'm remaining relatively calm at this point, but Brendan knows it's a brewin' and he bee-lines it upstairs and tells Aaliya that Bob is downstairs. I tell Bob that *he* is the contractor and is supposed to know these things since they're federal regulations and I hired him as an experienced, licensed professional to do the job. He then points to the invoice and goes through it line by line (leaving out the $500 'sales tax sale' that I got from the lumber yard) and says that he'll do the 30 to 32 bump for no charge and then I eat the remaining $642. I repeat that I have no additional money left and he starts trying to get me to sign the contract claiming that he's not making any money on it, just paying his guys (forgetting that we had a phone conversation after the last quote where we determined that he was making about $8410 in labor charges...deduct the $2200 for AEP and he's at $6210 and I know he's not paying his 3 laborers $2k apiece for 8 days or so of work). I refuse and tell him that I want time to look it over and go over everything with Aaliya since she had wanted to be part of this discussion.

Aaliya finally makes it downstairs and joins us and asks how it is going. Bob replies that he thinks he's put a fair offer on the table, then makes the mistake of repeating the notion that I share the blame. She launches into him which then leads back to the $1500 we lost on the steel building and takes us off track down that path and now we're all going at it. Finally I said "Look, I didn't want to go off on that subject, it's behind us, it's water under the bridge and we need to deal with this mess that we've got down here. I didn't want to go into jerk mode, but the bottom line is that you have a serious OSHA violation here and if it gets reported, you're going to get fined up the wazoo and be on OSHA's hit list. The cheapest, easiest solution for you here is to eat the cost to move the lines and let's get this building done." At that, he stopped and said "Alright...let's just get this thing done." I told him I'd look over the contract & invoice tonight (yeah, I'm going to be up his wazoo again tomorrow morning on how he padded this thing to try to cover his loss) and I handed him the addendum so he could sleep on it tonight (addendum just says that all associated line move costs are his responsibility and come out of his last payment). This was the Cliff Notes version, more assinine stuff was said. I am *steamed* and I'm probably not going to sleep well tonight.
 
Last edited:
Vapor barrier & 2" HD EPS foam board laid and first two circuits of PEX run:

OB0910aJPG-1.jpg


OB0910bJPG-1.jpg
 
Finished up the PEX circuits after dinner on Saturday. Sunday I installed the manifolds, connected the PEX to them, and pressurized the system...it's holding steady at 50 psi. I bought some more staples (can't believe I blew through 600 staples that fast) Sunday morning and went through another 150, then ran the edge insulation through the table saw at 45 degrees and put it back in place. No word from the builder yet, but I left a message that I was done and that he should lay the mesh and schedule the concrete pour. We'll see what happens with him tomorrow. I don't know if he's figuring that if he walks away, he's only out whatever he's paid his three guys for 3 1/2 days of work plus whatever his time is worth to him vs. the $2200 for moving the lines, or if he's just being unprofessional again. I know he wasn't happy about the 2-6 week wait for AEP to move the lines.

OB0913aJPG-1.jpg


OB0913bJPG-1.jpg
 
Looks like we've got everything settled, concrete should be poured on Wednesday.
 
Scooted home at lunch time and the concrete guys were troweling out the floor. They'll be back tomorrow to cut. Kinda nice when the owner lives up the street from you and comes by to do the job himself.
 
Hey Rodney-

Don't take this the wrong way. I am a builder and I run into problems all the time, and end up paying for them myself. I think that when everything is said and done and you are pleased with the project, you should consider splitting the cost of the electrical move. Obviously if you had known that the location you selected for your building would have added an additional $2200 to the cost, you may have chosen a different spot. Perhaps you would have kept it where it is because of setbacks or other requirements. Your Builder did not select the building location. He probably should have noticed that it would be a problem when he started laying everything out, but he didn't select the location. Since you did, and you pulled the permit based on your own layout, I believe you are responsible for the $2200. If you had hired the builder to submit the plans obtain the permit, and provide everything to you as a turn key project, he would have ultimate responsibility for everything related to the job including the $2200. I personally will not take any jobs where I don't have ultimate responsibility for all work at the site. No homeowner work or homeowner subs allowed while I am there with my crews. This is specifically to avoid any situations similar to yours. The moment somebody else sets foot on the job and starts working, anything that happens always turns into "not my fault".

Not sure why I started typing all this. Hopefully, someone will get something out of it. I do not know the details of your whole arrangement so if i am out of line, please disregard. I just thought I would put the builder point of view on it.

Later-
Tom

PS- Regradless of the outcome, you are going to have a great building to work in. Hopefully, you will soon forget about all of the trials and tribulations of getting it built.
 
A family member ran into a situation close to this where HE pulled the permit and hired a contractor to help when he got in over his head. Not saying that is what has transpired here. They built their home rather close to an old abandoned mine going into the mountainside. Nobody, including the county planning dept., knew of this old shaft. The contractor had almost exactly the same words for my brother as far as being hired for the whole project and being "turn key" for responsibility as opposed to doing only a portion of the work (responsibility) he was hired to do. As you say, after the project is done, a lot of reflection takes place and all seems to get resolved if EVERYBODY is close to happy. What finally ended up happening was that the old mine shaft ended up being one hell of a wine cellar. EVERYBODY was happy, even the poor old inspector who was almost the last to leave christening!
 
I appreciate your thinking/comments Tom, and it's the perfect solution to not do anything if not in total control.

However, if this guy signed on knowing that certain things were going to be done by our boy here, step #1 should have been to doublecheck it all IMHO. Of course, it's also important to note that the guy didn't know about the requriement and therefore it seems that he would not have been able to say otherwise if he'd been the one to do the permits and they'd be in the same spot.

I liken what I'm saying to an experience I had working on a Habitat for Humanity house many years ago. I showed up and in making assignments they asked for someone who knew wiring, so I volunteered. They wanted me to splice a backyard light into a circuit on the porch light switch. Guy takes me back to show me where and tells me "It's all set, power is off at the breaker box". You know what happened... luckily I had good wire snippers with well-insulated handles (that ended up with two perfect semicircles blown out of each jaw. If I'd have gotten nailed, would it have been that guy's fault or mine? I knew I should have checked my own damn self and never faulted the supervisor dude.

Another way to look at it: if one of this builder's guys got shocked, do you really think that the builder could ligitimately claim that it wasn't his responsibility?


All of that aside, I can't wait to see this thing finished off. Always so jealous of these awesome shop builds!!! :bow:

(though not so much the troubles involved in getting it built ;))
 
Your comments are appreciated, Tom. I honestly probably would've split the cost with him had I not lost the $1500 on the steel building through his failure to get an estimate from the concrete guy when I was making my decision back in May/June. He made assumptions rather than make a phone call and that is basically the same thing that happened here with the electrical. Simple fact is that at this point, I flat out do not have the cash to spend any more on this...hence no lift, no driveway, no insulation, no interior walls, no heat. It's my nature to compromise even if I don't feel that I'm at fault as I do not like conflict...I simply don't have the cash to compromise...I barely have enough left to finish paying for this.

I did not step into this with the intention of becoming as involved as I did. The builder simply laid these things (permits & drawings) off on me. We were sitting at the table one evening when he brought the first contract over and HE asked ME what was required for the permits and I grabbed my laptop and pulled the checklist up for him and he starts asking me what some of the things are. I thought I was just helping the guy out since he's busy and doesn't really have the time to sit down and do drawings and apparently doesn't use the internet which is where I got all of the forms & checklists...there I go being nice & compromising ;) Yes, I picked the spot based upon setbacks and the lay of the land, but I'm not a contractor. He was right there with me and whipped out his tape measure and started marking the corners and looked up and saw those power lines and:

1) Thought the building would clear (didn't measure).
2) Didn't know about AEP's easement (and didn't bother to call them)
3) Didn't know about the OSHA regulations (and later put himself & his crew in danger...again, a phone call to AEP would have netted him this info)
4) Assumed it was my service line despite the fact that the transformer is on the pole in the woods across from the building and the service line runs underground to the house from there (he was going to touch those lines if the electrician hadn't come by and stopped him).
5) Kept building to the point of no return when it should have been pretty obvious that there was going to be a clearance problem since he had all of the materials & measurements. He had 5 of the 6 back posts set the first day and at that point he could've checked his clearance and we could've backed up at that point and simply pivotted the building or moved it 8 feet further forward. He waited until the walls were completely framed and most of the fill was in place.

He had no problem using his knowledge to change other things like moving my service door from the front wall to the side wall so that there'd be more rigidity on the front wall, having me bring the vertical slab insulation up to the finish level of the floor so that the concrete wouldn't crack, opinions on the potential build sites, etc. This was simply a case of the man not knowing something that he should've known (and thereby putting himself and his crew at risk) and making faulty assumptions that would've been cleared up in the first 60 seconds of talking to an AEP engineer.

The only thing that I actually signed on to do here was the slab insulation & PEX which he didn't know how to do and even there he weaseled out of doing the vapor barrier and didn't finish the fill/grade job...I spent two hours out there when I should've been working on the insulation finishing up that job ("What area wasn't done? Well, there's a couple of piles of gravel left there...") because he quit early when he realized that he couldn't set the trusses.

Definitely a lesson learned. If I ever have to do something like this again, I'll either make sure that I'm dealing with someone like you, or I'll walk into it assuming the role of general contractor and make sure that I do all of the research.
 
BTW: It should be noted that most of the counties around here do not require a contractor to be licensed with that county and he let his license for this county lapse because they have a continuing education requirement and he didn't want to be bothered with that. He had to get some of his info from another contractor who is licensed here or he would've bought the wrong header for my 16' door. He also tried to tell me that I didn't need a vapor barrier because I had the slab insulation rather than calling the county and asking them. It was cheaper & easier to put the vapor barrier down than try to tape all of the insulation together on an unevenly graded floor and hope that the inspector was satisfied (and the vapor barrier was in the approved drawings). He thinks he's building in his hometown where they'll let him slide for stuff and then gets irritated when they don't. His contract also states that he gets paid when the building is done, my addendum states that he gets paid when it passes final inspection.
 