Great weekend at 4x4 Land working on the Charity Scrambler. Thanks to Mike for letting us take over his shop and thanks to Warren, Ken and Mike’s buddy Marvin for all their help.
The day got started with checking out the Hesco swap kit, man what a kit. After seeing what all it takes to do this swap it would have taken forever without the Hesco’s kit. We still needed a pressure side power steering hose so Ken volunteered to take the 2 hoses we had (1 CJ and 1 XJ) to a local shop and get them spliced together (Ken donated the $ for this item). Warren and Mike laid out the fuel system and got in ran to the fuel rail. I changed the valves on the shocks and tried to stay out of their way. The next step was putting the harness, computer, canister and vacuum lines under the hood. Never seen so many wiring plugs and lines in my life. Mike, Marvin and I worked til about 9:30 p.m. Mike got a call at 10 about a problem at his Colorado house and he had to fly out early Sunday morning so Marvin offered to open the shop so we could continue working. We didn’t get the Scrambler running yet but did finally get it to fire, probably just a timing issue now. Also got started bleeding the brakes.
Arrival at 4x4 Land.
Fuel injection fuel lines componets installed.
We need one of these lifts for our shop.
Warren (scramblur) working on fuel system
Mike (scrangler) mounting the computer with Ken (ibscrmbln) lending a hand.
CJ harness wires ready to be weeded thru for gauges and switches.
We have lights! The guy in picture is Mike's buddy Marvin he is a wiring guru he was around all weekend and kept us moving along. HUGE thanks to Marvin for the work he has put in and will put in finishing it up and making it look pretty.