After being wrapped up with the splint for 2 weeks, they went back to a simple gauze patch and an ace bandage. So out to the shop I headed. Installed a couple of different dome lights and got them wired up. These were the last loose wires I had hanging around. All the electrical system has been acting correctly for the last month or so no dead batteries everything works. So I think it is time to get this assembled!.



1. Seats
2. Steering Wheel
3. Put top/doors back on. This also means putting the Qtr. panels, welting, tail light, gas filler neck.
4. Get the local guy busy on the drive shafts (Been here once lost the paper with notes)
5. Make an appointment for exhaust pipe install.
6. Figure out what tires I want to put on and get them ordered and on.
7. Get it down to the Glass shop and get the windows installed in the top.
8. Get it to my Buddy's shop to get the A/C system charged up and working.
Once it can drive I have suspension "tuning" to do. Bump stops and maybe need limiting straps, possible change in shocks as well, hope not.