It has been awhile since I updated with pictures. In late July, I got back to working on the shop. I filled in the "corrugated gaps" with concrete. This took almost 2 days of hand mixing 24 bags of cement. Put a little slope on them. Hopefully now the water will run off and no longer come into the building. I also spent a good deal of time researching how to do the electrical connections between the service panels (breaker box and the electric meter base).
Truck
Truck


...frustrating when different inspectors interpret things differently. I had to rewire some stuff with bigger boxes, but finally passed inspection so building is complete as far as the county is concerned. 