• Notice for iPhone users: DO NOT use the image size reduction option when uploading photos to the forum. This causes portrait images to post as landscape. We have added a warning to the image insert pop-up as well.

Two Weeks to Go - What do you still have to do

Gscram

Scrambler Junkie
SOA Member
SOA Board Member
City
Brandon
State
MS
I finished tightening bolt and greasing everything. Need to do some serious cleaning this coming weekend. May not get the CB hooked up before I leave. I can hardly wait to get on the road.:drool:
 
Finish Roll Cage:
~Finish CO2 Tank Mount
~Weld in fire extinguisher mounts
~Bend and weld in grab handles
~Weld in 39 gussets
~Weld in tabs for overhead console
~Weld in small wires for wiring attachment points
~Clean, paint, and re-install
Tube Fenders:
~Drill holes for things that attach to them
~Remove from Jeep and finish weld
~Grind, clean, and paint
~Re-install
Install CB in overhead console
Wire in LED lighting
Replace Rear U-joint
Check front and rear wheel bearings
Heat shield for muffler
Bump stop extensions in rear
All fluids

Gonna have a busy weekend.:eek:
Glad the weather forecast is looking a bit dryer and "cooler".
 
Vacuum out the Michigan sand.
Put the half top & doors back on.
Buy a spare tie down strap for the trailer.
Buy water and trail snacks.
Pack every tool I own.

Have already changed the oil, new alternator (didn't need one, bad connection), added a fusible link to the alternator circuit and a separate ground, replaced an exhaust hanger, gave it a bath.
 
Install Master cylinder
fab radiator bracket
install radiator/condenser/ shroud
install & plumb Vintage air & heat
wire dash
install seats
wire engine
install drive shafts
fab fuel fill plumbing
assemble & install doors
bleed brakes

Other than that, not much.
:wave:
 
Everything I can think of is actually to the transportation to get out there!

Bus:
-Pick up from shop in NE OH where it's getting a new torque converter, pump seal, deep tranny pan, temp gauge in tranny output, temp gauge in pan and new u-joints in the driveshaft
-install two tranny temp gauges
-pack

Trailer:
-install second pair of new electric brakes/test
-install/reinforce tiedown points
-check wiring when hooked to bus
-install spare tire mount/spare

Postal:
-install new rear belt to replace one swiped for bus use
-pack spare junk/tools
I've already tightened things, lubricated, changed oil, etc.

:fingerscrossed:
 
Finish cage install
Mount fire extinguisher
Install spare tire carrier
Get tools together
Misc. wiring to finish

Get the trailer ready to go: Tool box, tie downs, spare, etc.

This will be my first scrambler event, so I'm sure that I will forget something.
 
Install fender flares
Drive
Install rocker trim
Drive
Troubleshoot dash lights
Drive
Troubleshoot front markers
Drive
Install rear seat & belts
Drive

As you can see, I'm plannin to drive as much as possible to shake out the bugs.....hard work, but someone has to do it.
 
What are you doing Mike?
Plating the frame and a coilover hoop?
 
Finally going from coils to coil-overs. Plated the frame 10 years ago when I first built this one. Glad I did, the hoops need some meat to attach to. Should get it done no problem, we roll in a little over a week!
 
Pack it up.
Put in gas.
Point it west.
Drive.

That's really about it. I completed prep yesterday. :)

Oh, I forgot, I need to update my AAA still.
 
Still work to do this weekend.
How is everybody else's lists coming along?
Getting excited!

Tube fenders are done as is center console.

Still left:
Finish overhead console
Finish CO2 tank mount
Hand holds
Weld in gussets
Weld in wires for wiring
Clean and reseal diff covers
Re-install fenders and reattach accessories
Flex rear axle
Bump stops
Heat shield
Fluids
Check front bearings and seals
Rear u-joint
 
Load it on the trailer.
Buy snacks.
Pack Beth.

I was in good shape last week. Even got as far as cleaning the windshield. Pulled the driver's side wiper back enough to clean, and snapped the rusty spring in the wiper arm. Fixed now.

See y'all soon.
 
1 of the 4 we plan to bring decide to start dumping oil pretty bad out the rear main.
Dad got it tore down last night and is ready to install seal and slap it back together.
He should finish that up today.

Basically down to packing all the crap that goes along with bringing 3 trucks, 4 Scramblers and my smoker/cooker. Not to mention all items for putting on the National!
 
1 of the 4 we plan to bring decide to start dumping oil pretty bad out the rear main.
Dad got it tore down last night and is ready to install seal and slap it back together.
He should finish that up today.

Basically down to packing all the crap that goes along with bringing 3 trucks, 4 Scramblers and my smoker/cooker. Not to mention all items for putting on the National!

JUST DON'T FORGET THE SMOKER. The rest is optional.
 
no rear end.JPGGet the rear end back under the Jeep. I plan to be there tomorrow afternoon. Brandon has ask if I would lead a group on the trails Saturday. My wife will be with me, and we are looking forward to a good day of trail riding. I will be camped in the white Ford "offroad" van. Come by and say HI. You are going to love SMORR!
 
Back
Top