Everything I can think of is actually to the transportation to get out there!
Bus:
-Pick up from shop in NE OH where it's getting a new torque converter, pump seal, deep tranny pan, temp gauge in tranny output, temp gauge in pan and new u-joints in the driveshaft
-install two tranny temp gauges
-pack
Trailer:
-install second pair of new electric brakes/test
-install/reinforce tiedown points
-check wiring when hooked to bus
-install spare tire mount/spare
Postal:
-install new rear belt to replace one swiped for bus use
-pack spare junk/tools
I've already tightened things, lubricated, changed oil, etc.
