I want to give huge thanks to Dustin (Jeeperdd), he came up to the house today and helped me get a TON of stuff on the frame back together and wired. Would have taken me weeks with his help got it all done in a day. Got going this morning and managed to
- reinstall fuel tank
-bend and mount new hard fuel lines
- re-plum all the soft lines on the top of the fuel tank
- all shifters reinstalled
-shocks cleaned and re-mounted
- new fuel pump for the fuel injection installed just need to find a clamp
- Drive shafts back in
-inspection cover found and installed
- steering box installed
- front shock towers modded for drainage and mounted
- Brake lines finalized on rear axle
- bump stops installed
- sway bar installed just need new links
- Throttle body adapter reworked and installed
- throttle body installed
- Distributor installed
- Stock wiring harness reworked for fuel injection and installed in engine area
- Fuel injection wiring harness deciphered and wired.
Heck of a day lots of progress. Feels pretty good to be able to see the bench that was covered with all those parts.
