Things are still plodding along. I ordered the building framed for a 16x12 on the front and 9x7 on the side but bought the doors locally as their installed price was only marginally higher than the door price from Clopay via Freedom Steel. Decided to hold off on replacing the house doors until after the building is up just in case I need that additional cash. I'll frame out and install the service door later myself. The PEX and supplies are sitting in my garage, just need to buy staples and rent a stapler when the time comes. The plans arrived Friday evening, so this week's mission is to get cracking on the permits. Builder called this morning (he came in with a reasonable number) to see if the plans arrived so he can schedule breaking ground. If things go okay, I'll hopefully be breaking ground in a week or two to grade and pour the footers.

The engineer did call me back and he verified that they'd just run overhead, no charge, and the building is tall enough that I don't need a mast. Hoping to hear back on the building permit today or Monday. Got a couple of Linksys WRT54G's from work and started flashing them with DD-WRT so that I can convert one into a repeater and the other into either a bridge or a repeater-bridge in order to extend my wi-fi coverage out to the building. I'll probably need to pickup a couple of outdoor antennas too.