Appreciate it everybody
The only person who has seen this Scrambler in real life who is on the board is JeepAddict, but that was a while ago, but he still might vouch for it
As far as the progress/time issue, I wanted to keep up a steady pace of progress on this rebuild. When I began planning to do this project I was only originally figuring on fixing the body and painting the frame. But, once I had it all apart, it just didn't make any sense to bolt on all the old/dirty/leaking stuff and not due upgrades at the same time. I guess I could have bolted all the original stuff back onto the freshly painted frame and body, but then i would just end up redoing it all later on. So, i figured might as well just do it all at one time, especially considering how easy it is to do alot of this work why the entire vehicle is in pieces.. Once I made up my mind to rebuild/replace/upgrade everything at the same time, I kind of thought about in what sequence to do things in the available space that I have. Once the body and frame were out of my garage at the paint shop I had enough room to lay out all the power train pieces and rebuild them. I knew that I really needed to get all that stuff ready to bolt back in because as soon as the frame/body were finished they would be back in the garage taking up all my work space. Once I started bolting the frame/body/power train back together, and seeing how nice all that stuff looked, I knew if i took any "shortcuts" on anything else that it would stick out like a sore thumb and bug me to no end. Basically, one nice/new/rebuilt/replaced piece fed onto others and pretty soon snowballed out of control into what you see here
I don't work at home, I have to go to the office every day, unfortunately

If I was supposed to be "working" at home, I would have been fired due to lack of self discipline, i.e. I would be spending all my time in the garage playing with Scramblers instead of "working"

I just tried to use my available work on jeep time as efficiently as possible. I would try to do a whole bunch of "prep" type work on weekday nights to get ready for weekend work sessions. This project as taken a vast majority of all my free time the last 7 months or so, but I still found time to do other things, too. I figured I would rather try to complete this build in the shortest amount of time with constant progress versus stretching the project out over several years. Once I start to work on something I like to "attack" it until it is finished. I think that the steady work/progress motivates me and resulting progress feeds on itself. There were times when I looked out into my garage at the piles of rusty parts, 100's of zip-lock bags full of rusty hardware, power train pieces scattered about the floor, no body or frame to be seen, and I thought "What did I get myself into?". But, I learned early on not to look at the project as a "whole" but instead to look at it a series of "mini projects" and it would stay manageable. I wish I would have kept some of my "to do" lists scratched out on paper. I have probably been through at least one hundred "to do" and "to buy" lists
I am glad that all the pictures in this thread are useful reference to others, too. This is definitely not a definitive step by step "how to rebuild a jeep" thread, but hopefully it provides some good reference material and is enjoyable to view
Appreciate all the compliments/suggestions/critiques/opinions etc.
Oh, and this particular post by me is