Well I haven’t been on here much lately, for good reason. The addition of the house is pretty much finished with the exception of exterior paint. Everyone has moved in and settled nicely. The shop is finished with the exception of sealing my side of the floor and building shelves.
The next phase was supposed to be fairly simple, taking two small bedrooms and making them into one large master bedroom for Carol and me. However, nothing is simple when you’re dealing with 1970s construction. What ended up happening is we have removed all the Sheetrock, insulation, plumbing, and wiring in the complete old portion. We found missing window headers, dangerous electrical, and downright stupid plumbing. So we stripped it down to the studs. Removing walls necessitated 4 beans to be installed in the master, and we opened up the kitchen and living room by removing a hall and a wall. We ended up having to install a 22’ beam to support the roof, but now we have a beautiful open concept living area. Well, we will once it is done. ETA 2 more months...
I’ll post up pics when I get the energy.