Here's a little project from this morning, part of getting it from 90% to 95%... over the course of the years the drip rail had gotten damaged a little and removing the damage created a 3/32" dip in the top edge at one point, (photo 1, I've used my straightedge and a yellow card so you can see the problem). I had left this to the end because it wasn't until yesterday that I decided on a good way to repair it. This really needed to be fixed, it would definitely be noticeable in final paint.
I'm preparing to plug weld a narrow strip of 20-ga. steel to the back of the drip rail to establish a new upper edge. I've drilled holes in the drip rail for the plug welds (photos 1 and 2) and I've used Cleco clamps to hold the strip in place for welding (photo 2).
In photo 3 I'm welding, clamping a piece of copper sheet behind the repair piece so the welding doesn't don't blow through the thin repair strip. I move the copper for each hole.
The fourth photo shows the welds done, and in the fifth photo the welds are ground flush. In the fifth photo you can see I'll need to do a tiny bit of filler work to fill between the top of the damaged drip rail and the new backer piece, it's a little hard to see in this photo.
The last photo, also bit hard to see, it is filled and rough sanded. When this is finished and painted, and the drip rail has been refilled with drip rail putty, you won't be able to tell it was repaired.
All that's left to do before it goes to the body shop is a final close inspection of the entire top and smoothing of any imperfections I find in the body work, also some seam sealer on some of the inside joints where I've welded panels together. I'll get all that done Monday morning. Probably will drop it off at the body shop Tuesday for final prep and painting.