This week's progress...shifty business...
Ok...no progress last week, I worked full time and spent the weekend celebrating the Fourth with the family. But this week I got some things done.
First on the agenda was making the rear axle "permanent". I squatted down the rear to ride height with rachet straps, and set the pinion angle. Then I pulled the axle and welded on the perches and the shock mounts. (Forgot to take pictures "in process".) Reinstalled the axle, swapped over the parking brake cables, installed the rear shocks, ect. Here's how the rear looks now.
Next, I decided to fabricate a 4x4 shifter. Something simple but sturdy. A few scraps of steel, a quick trip to the hardware store for bronze bushings and misc hardware, some small heim joints I have had for years, and some drill press time and a bit of welding. The basic parts:
Assembled and installed. Tough as nails, shifts smoothly, and there's no slop or potential rattle. The shifter cane will be replaced, that's just an all-thread mock-up. (I tapped the top piece to make the cane easy to swap.
On to the transmission shifter. I'm using a cable shifter, adapting an 08 Explorer shifter with a B&M cable. I wanted the shifter up above the pan, out of harm's way. Had to flip the arm on the trans and "reclock" it, (cut and weld), and then fab up a cable bracket using more scraps and a leftover bracket from the B&M shifter in my Jeepster. The cable pivot on the arm is a shortened, drilled and tapped clevis pin.
Then I started welding the plethora of holes in the firewall. No pictures- because it isn't any fun and I hate welding thin sheet metal. I'll post up "finished" pics of this part of the project. My body guy says I should just use panel adhesive and glue patch panels on the back...don't think i'm not tempted...