Shop addition 30' x 40' - Adams Family Scrambler World HQ

Another awesome sunset!
20250102_171123.jpg

Purlins all on except the top row on each side.
Had some bad boards, plus it's so tall I need help with them anyways.
Was a bit cold and nasty this morning.
20250104_102431.jpg

Weather got crappy, plenty to do indoors.
Made kicker braces that go from bottom of truss to purlins.
20250105_144808.jpg

Trial fit of a horizontal tie angle. I got 4 made and painted but only got 2 up before weather turned.
20250103_164511.jpg
 
Slow going as weather turned to crap. Got some ice then a nice layer of snow over that.
20250105_145210.jpg

Shoveled the snow off Friday and then worked on chipping the ice off Saturday.
No pictures, but did all but 3 kicker braces and the other 2 horizontal tie angles installed Sunday.
20250111_165359.jpg

20250111_165353.jpg

In between shoveling and ice chipping, I was able to get these cross brace rods made and painted.
20250112_172019.jpg
 
Progress has been slow as usual.
Some may recognize these rear cross member tabs.
I repurposed them for attaching tensioning cable on the bottoms of the middle 2 sets of trusses.
20250202_155936.jpg

Broke out my Karnage portable/cordless welder to glue some tabs and brackets to the trusses.
Have not used it for trail repairs yet but has been very handy around the shop.
20250131_160312.jpg

Brackets for the cross brace rods.
20250202_160018.jpg

Cross brace rods installation. Also you can see the tensioning cables run from bottom of trusses.
20250202_160002.jpg

Wall extension between the trusses.
20250202_160037.jpg

Finished sheathing the north side.
20250202_160048.jpg
 

Attachments

  • 20250202_160048.jpg
    20250202_160048.jpg
    1.3 MB · Views: 3
Finished up sheathing the south side. Now to start framing in the gable end walls.
20250203_164220.jpg20250203_164252.jpg

Also finished up welding in the cross brace rod brackets.
20250203_173231.jpg

Looks like Karnage welder is getting decent penetration (3/16" thick metal)
20250203_173129.jpg

Had to get a bit creative to reach the most upper ones at about 22' and the lift only gets me about 20'
20250203_173940.jpg

20250203_173948.jpg

20250203_171501.jpg

20250203_180200.jpg
 
Well a month gone with little to no progress. Weather been crap, got super busy at work and a family member passed.

Picked up roof and wall tin for the addition and roof tin to replace on existing shop.

20250307_135501.jpg

Having to turn a few wrenches on the skid steer as we have a major hydraulic leak on one of the hoses.
20250307_174801.jpg

20250307_180548.jpg
 
Skid steer is back in operation. Instead of a giant pool of hydraulic fluid under it after sitting we are down to 4 or 5 small spots.
Think most of it is residue left from leaks and repairs. Weather not yet conducive for pressure washing.

Did get a solid weekends worth of work done on the shop addition.
The west wall is fully framed out now and ready for sheathing.
That may not happen for a bit as we are predicted to be having high winds.
20250316_132532.jpg

20250316_193107.jpg

20250316_193250.jpg
 
Think DeWalt should sponsor me!
20250321_123415.jpg

Was a bit windy Friday & Sunday to put on sheathing.
Took all day by myself to get about 7 sheets on the west end gable.
Was one heck of a workout up and down the ladders.
20250323_095843.jpg

Tried out my new DeWalt cordless router with flush cut bit to cut out the walk door opening.
Man that works slick
20250323_194427.jpg

Took a peak at/in the existing shop to see what I had so I can figure out how I'll tie in for the east end gable wall.
20250323_170424.jpg
 
Finished up the west end wall sheathing.
Man it's a ways up there!
b7cd3429-424f-4679-a6a5-7ac0c05bc3f0.jpg
20250327_131558.jpg

Next up east wall tie in to old shop. Opening her up.
20250327_183929.jpg

20250328_104146.jpg

20250328_135811.jpg

As slow as I am, thought we'd better cover it up as we are in storm season.
Hopefully this will keep the majority of water out.
20250328_183748.jpg

20250328_194253.jpg

20250328_194300.jpg

Weather guessers were saying storms Saturday night so we battened down the hatches.
They missed it again, light rain and wind is all we got, which was fine with me.
20250329_192506.jpg

20250330_184502.jpg
 
Picked up and installed 2x's and got the end wall framing finished up early last week.
Had big plans to get it all sheathed this past weekend but the weather put a halt to that.
Sunday was the only day weather permitted working on it. I did get a fare amount done in that day.

Probably won't get much done this week/weekend either. I head to Davis, OK, Cross Bar Offroad park for some Ultra4 racing Thursday morning and not sure If I'll be back Saturday evening or Sunday. Oh well, I'm ready for a few days away!
20250406_180607.jpg
20250406_202210.jpg
20250406_202430.jpg
 
Had a great weekend get away to hang with the Mudd Nutt (Ulatra4) race teams.
Both teams brought home the gold in their classes.
1744631985058.png
1744632014483.png

I did get home Sunday and got a half a day in at the shop.
Finished up the east wall sheathing in between wind gust.
Glad I only had 1 1/2 sheets to get on.
1744632235646.jpeg

1744632248275.jpeg

Couple action shots! LOL
1744632417011.png